Floor Load
Rating
(kg/m2)
300
Notes:
1.
Actual clearances for installation should be determined after consulting with the construction
specialist responsible for installations in the building. Clearances can vary depending on the
size/layout of the system and building conditions.
2.
When various configurations of storage systems are arranged in a row, clearance values
based on the largest storage system configuration should be used.
3.
For easier maintenance operations, make clearance (c) as large as possible.

Four-rack configuration - two controllers (left)

The following figure shows the service clearances for a four-rack, two-
controller configuration, with the controllers in the left two racks.
Hitachi Virtual Storage Platform G1000, G1500, and Virtual Storage Platform F1500 Hardware Guide
Required Clearance (a+b) m
c= -0.3
c=0
c=0.2
4.4
3.6
3.2
Site preparation specifications
c=0.4
c=0.6
c=0.8
2.8
2.5
2.2
c=1.0
c=1.4
1.9
1.5