Floor load
rating (kg/m2)
350
300
Notes:
1.
Actual clearances for installation should be determined after consulting with the construction
specialist responsible for installations in the building. Clearances can vary depending on the
size/layout of the system and building conditions.
2.
When various configurations of storage systems are arranged in a row, clearance values
based on the largest storage system configuration should be used.
3.
For easier maintenance operations, make clearance (c) as large as possible.
Two-rack, single-controller configuration
The following figure shows the service clearances for a two-rack
configuration.
Hitachi Virtual Storage Platform G1000, G1500, and Virtual Storage Platform F1500 Hardware Guide
Required clearance (a+b) m
c= -0.3
c=0
c=0.2
0.9
0.7
0.6
1.4
1.1
1.0
Site preparation specifications
c=0.4
c=0.6
c=0.8
0.6
0.5
0.4
0.9
0.8
0.7
c=1.0
c=1.4
0.4
0.3
0.6
0.5
87