Procedure: CRATE UNPACKING INSTRUCTIONS

Description: Instructions for how to unpack the items in the Seakeeper crate.
1) Refer to instructions on page 2 for removing the metal clips. Clip removal tool is attached to the crate
and circled in image below. Remove the clips at the top of the crate and carefully remove the lid.
2) Remove the 4 sides of the crate.
3) Keep the gyro bolted to the base until ready for installation. The base may be moved using a forklift or
pallet jack if needed. To separate gyro from crate base, remove the lag screws at each corner of the
frame shown circled below. A ¾" socket or wrench will be required. Additional bolts (shown with arrow
below) inside the frame will need to be removed and require two, 9/16" wrenches. Attach slings or
chains to lift eyes at top of enclosure as shown on page 3. Prior to lifting, read step 4. Note gyro may
look different than illustrated below.
Product:
UNPACKING
INSTRUCTIONS
SEAKEEPER 6 / 5HD / 5
Document #:
Rev:
90369
4
Page:
1 of 3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 6 and is the answer not in the manual?

Questions and answers

Summary of Contents for Seakeeper 6

  • Page 1 1 of 3 Procedure: CRATE UNPACKING INSTRUCTIONS Description: Instructions for how to unpack the items in the Seakeeper crate. 1) Refer to instructions on page 2 for removing the metal clips. Clip removal tool is attached to the crate and circled in image below. Remove the clips at the top of the crate and carefully remove the lid.
  • Page 2 Procedure: Document #: Rev: Page: UNPACKING INSTRUCTIONS CRATE UNPACKING INSTRUCTIONS 90369 2 of 3...
  • Page 3 Use caution when removing mounting bolts to keep from damaging cables and hoses on the gyro. REVISION HISTORY REVISION DESCRIPTION OF CHANGES DATE APPROVED INITIAL RELEASE 03DEC2015 SEAKEEPER LOGO CHANGE 12OCT2016 COMBINED SK 6 / 5HD 27JUL2018 CHANGED CRATE, ADDED SK5 18JUN2019...

This manual is also suitable for:

5hd5

Table of Contents