Intec SHINGLING CONVEYOR Installation Manual

Advertisement

Quick Links

SHINGLING
CONVEYOR
Installation Guide - English

Advertisement

loading

Summary of Contents for Intec SHINGLING CONVEYOR

  • Page 1 SHINGLING CONVEYOR Installation Guide - English...
  • Page 2: Table Of Contents

    Checking contents ............................4 Assembling the conveyor legs ........................5 Attaching the output stacker tray to the conveyor ..................7 Preparing your Intec printer and aligning the conveyor ................8 Connecting power ............................10 Input controls ............................. 10 © 2016 Intec Printing Solutions Limited. All rights reserved.
  • Page 3: Preface

    • Report any missing items or shipping damage to Intec support: support@intecprinters.com About this manual This manual is intended for use by end users and Intec trained installation engineers. It explains how to install the Intec shingling conveyor for your Intec printer. Before you start One (1) person may complete the setup of the Intec shingling conveyor.
  • Page 4: Assembling The Conveyor Legs

    Z - Stacker tray screw x 3 Assembling the conveyor legs Instructions for assembling the Intec conveyor legs before attaching to the Intec printer: 1. Remove the securing pin from the bottom of the front leg and remove the metal bar.
  • Page 5: Attaching The Output Stacker Tray To The Conveyor

    1. Open the stacker face up exit tray of your Intec printer. 1. Place the shingling conveyor upright onto it’s legs. Remove the 2 small Phillips head screws from each side of the conveyor unit. Retain screws and backing - these will be re-inserted once the stacker tray is manoeuvred into place.
  • Page 6: Connecting Power

    Connecting power 4. Roll the shingling conveyor into position. The conveyor table will not be at the correct height. Adjust height of front legs by inserting height adjustment screw (X) into the top of front legs and turning in a clockwise rotation.