Extreme Networks XEM XTR Operation Manual page 77

Chapter 5 surface equipment
Table of Contents

Advertisement

Extreme Engineering Operations Manual |
11. Secure the BOP clamp cable on to the adjustable pliers by tightening the bolt and closing the
Ring.
12. Attach the plier on to the BOP firmly so that rig vibration does not result in a loss of the
connection.
13. The other end of the BOP Clamp cable 22CABL0055 has a 2x pin Male connector.
Attach the 2 x Pin Male connector to the BOP port on the XTR. If Extra length is required add
the 25m long extension (22CABL0056) in between. Any number of Extensions can be added.
14. Ensure the contacts are clean.
Private. Copyright © Extreme Engineering 2012. Unpublished Work. All rights reserved.
Figure 102 BOP Clamp cable clamp attached to the BOP
Surface Equipment
Page | 76

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xem xrt

Table of Contents