Extreme Networks XEM XTR Operation Manual page 31

Chapter 5 surface equipment
Table of Contents

Advertisement

Extreme Engineering Operations Manual |
V.
Place the Azonix terminal on a flat surface with the display facing down. Place the
rectangular bracket such the screw sockets on the Azonix terminal align with holes in the
bracket.
VI.
Install the Screws (4 inner or 4 outer) to fasten the Azonix terminal on to the bracket.
8. Secure the Azonix such that the Screen is vertical position.
9. It is preferable to have less mechanical vibration or direct water spray associated with Rig
Operations.
Private. Copyright © Extreme Engineering 2012. Unpublished Work. All rights reserved.
Figure 38 Hex Allen Key 1/8 & size 10 -32 screws
Figure 39 Bracket and Azonix aligned, Screws installed
Surface Equipment
Page | 30

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xem xrt

Table of Contents