Download Print this page

Campbell CPEC200 Quick Deploy Manual

Closed path eddy covariance system
Hide thumbs Also See for CPEC200:

Advertisement

Quick Links

All manuals and user guides at all-guides.com
CPEC200
Closed Path
Eddy Covariance System
Quick Deploy Guide
February 2016

Advertisement

loading

Summary of Contents for Campbell CPEC200

  • Page 1 All manuals and user guides at all-guides.com CPEC200 Closed Path Eddy Covariance System Quick Deploy Guide February 2016...
  • Page 2 All manuals and user guides at all-guides.com 1. Setup tripod and mount enclosures. Mixed Mast and Leg Mount Leg Mount CPEC200 Enclosure EC100 Enclosure CPEC200 Enclosure Pump Module EC100 Enclosure Optional Scrub Pump Module Module...
  • Page 3 All manuals and user guides at all-guides.com 2. Ground tripod and enclosures. Ground Lug Grounding Rod...
  • Page 4 All manuals and user guides at all-guides.com 3. Setup tripod or mast with CM20X Crossarm. Crossarm-To-Pole Bracket CM20X Crossarm...
  • Page 5 All manuals and user guides at all-guides.com 4. Mount the EC155 bypass tube. Mounting clip EC155 bypass tube...
  • Page 6 All manuals and user guides at all-guides.com 5. Mount gas analyzer and sonic anemometer. Leveling Bubble CSAT3A Sonic Anemometer Head EC155 Gas Analyzer Mounting Platform CM20X Crossarm EC155 Boom Adapter...
  • Page 7 All manuals and user guides at all-guides.com 6. Connect EC155 and CSAT3A to EC100 Electronics. EC155 Analyzer Cable CSAT3A Cable EC155 Sample Cell Cable...
  • Page 8 All manuals and user guides at all-guides.com 7. Connect system plumbing. Zero Air Tubing Pump Tubing Analyzer Tubing Span Gas Tubing Pump Module Cable...
  • Page 9 All manuals and user guides at all-guides.com 8. Connect system wiring and insert compact flash (CF) card. Insert CF Card System Power Cable (ensure +12 Vdc power supply is off) EC100 Power and SDM Cables...
  • Page 10 All manuals and user guides at all-guides.com Power Cable Power Cable to +12Vdc to EC100 Power Supply (off) EC100 SDM SDM Cable to EC100 EC100 Cable Power Cable...
  • Page 11 All manuals and user guides at all-guides.com Turn on the +12 Vdc power supply and use the datalogger keyboard display to set settings and initiate zero/span checks. 9.1 Press Esc to activate the display. Press Enter 9.2 Select Configure System. to display the System Control Menu.
  • Page 12 All manuals and user guides at all-guides.com 9.3 Select SONIC_AZIMU. 9.4 Enter the CSAT3A sonic head azimuth.
  • Page 13 All manuals and user guides at all-guides.com 9.5 If the CPEC does not have a valve module, 9.6 Select CO2_SPAN_PPM. skip to 9.10. Otherwise, select Zero/Span Config.
  • Page 14 All manuals and user guides at all-guides.com 9.7 Set CO2_SPAN_PPM to match the CO 9.8 Select CHECK_ZERO, SET_ZERO, concentration of the CO span gas tank. CHECK_SPAN1, SET_SPAN1 in sequence. Leave CHECK_SPAN2, CHECK_SPAN3, and CHECK_SPAN4 as FALSE unless the 6-valve module is being used.
  • Page 15 All manuals and user guides at all-guides.com 9.9 For each value selected on the previous 9.10 Press ESC to exit. screen, change the setting from False to True for auto zero/span.
  • Page 16 All manuals and user guides at all-guides.com Please visit www.campbellsci.com to obtain contact information for your local US or International representative.