Mounting - Nibe PV 3031 3 kW Installer Manual

Pv solar package
Table of Contents

Advertisement

4 Mounting

Overview
The adjacent image illustrates when PV Solar package
is installed on a house roof.
NOTE
Ensure that the strength and load capacity
of the roof structure are sufficient.
NOTE
If there is not a sufficiently stable substructure
such as tongue and groove or trusses to allow
a durable installation the roof must be rein-
forced.
System overview, installation components
Before installing solar panels
1.
Number of rows of installed solar panels x height
of solar panels (plus distance between the solar
panels where relevant).
2.
Number of solar panels installed horizontally x
(solar panel's width + 24 mm) + 31 mm.
3.
The horizontal distance between the mounting
points for the roof brackets.
4.
Solar panel height
5.
Mounting points' vertical location = 1/4 panel
length.
6.
Max distance between the last roof bracket and
the end of the mounting rail = 200 mm
10
Chapter 4 |
Mounting
Roof bracket, stainless
steel
Joint with rivet
Solar panel
End clamp
1
5
4
5
24 mm
19 mm
Mounting rail, horizontal
2
2.
Roof bracket location
3
6
3.
6.
PV Solar package

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pv 3063 6 kwPv 3093 9 kw

Table of Contents