3 Installation General Installation and positioning 4 Mounting 5 Electrical connection Outline diagram 6 Commissioning and programming Guided first commissioning Country setting Programming 7 Maintenance Service 8 Technical specifications Item register Contact information PV Solar package Table of Contents |...
This symbol indicates tips on how to facilitate using the product. Marking The CE marking means that NIBE ensures that the product meets all regulations that are placed on it based on relevant EU directives. The CE mark is obligatory for most products sold in the EU, regardless where they are made.
If the panels are installed in formations other than as shown in the example, additional mounting materials may be required. To order additional components or installation materials, contact: NIBE AB Sweden Box 14, Hannabadsvägen 5 SE-285 21 Markaryd Tel: (+46)(0)433 73 000 info@nibe.se PV Solar package Chapter 2 | Delivery and handling...
(Pre-completed form is available on www.nibe.se) Please note that the installation must not be put into use before Lightning protection the power supplier has given its approval.
3. Multiply the result 2 by a constant 0.9 to calculate the energy production in kWh/year (with a reserva- tion for shade, dirt and snow coverage). Example: Visby, 45°, installation south. 1050 x (112/100) x 3.12 x 0.9 = 3302 kWh/year Chapter 3 | Installation PV Solar package...
4 Mounting Overview The adjacent image illustrates when PV Solar package is installed on a house roof. NOTE Ensure that the strength and load capacity of the roof structure are sufficient. NOTE If there is not a sufficiently stable substructure...
Page 10
The roof bracket must not press directly into the roof groove/ Truss tile. Use a spacer plate! The spacer plate must be made of a water and weather resistant material. Spacer plate Wood Batten screw Chapter 4 | Mounting PV Solar package...
Page 11
Mounting Nut M10 Installing the mounting for installing solar x 10 panels on felt roofs Screw 1. Install the plate on the roof according to the usual rules and practice. Coach bolt M10 PV Solar package Chapter 4 | Mounting...
Page 12
Adjust the first mounting rails installed in relation to each other and the roof cladding. Then fix the mount- ing rail to the roof bracket by tightening the nut. Tightening torque 12-15 Nm. Chapter 4 | Mounting PV Solar package...
Page 13
Secure the solar panel with the end clamp screw, tighten to 8 Nm. Caution Secure the wiring between the solar panels. Caution Take the return cable when installing the panels. See section Electrical connec- tion/Cable routing PV Solar package Chapter 4 | Mounting...
Page 14
Install the following rows in the same way. Chapter 4 | Mounting PV Solar package...
Insert the stripped cable into the connector. Strip the cable approx. 10 mm. Close the sprung quick release catch. Insert the insert into the screwed connection. Tighten the screwed connection. Both connector types are opened using a screwdriver. PV Solar package Chapter 5 | Electrical connection...
Page 16
NOTE Additional connectors and mounting materials may be required to install solar panels in differ- ent groupings. Chapter 5 | Electrical connection PV Solar package...
Page 17
Grounding solar panels Solar panels must be earthed in the inverter or an extern- al junction box. Lightning protection For information regarding lightning protection see page 8 under "Installation". PV Solar package Chapter 5 | Electrical connection...
The display language is set sep- arately. NOTE The country can only be set once! If the incorrect country has been set, contact your installer! If your country is not in the inverter, contact your installer! Chapter 6 | Commissioning and programming PV Solar package...
6. Press, the year is marked. 7. Repeat points 1 to 3 for the year. 8. Press, back up the menu tree. 1. Press, “Time format” is marked. 2. Short press, confirm selection. PV Solar package Chapter 6 | Commissioning and programming...
Page 20
1. Press for 1 second. “Sweden” 1. Short press. 2. Press, back up the menu tree. 1. Press. “Finish” is marked. “Finish” 1. Short press. “All settings correct” 1. Press for 1 sec. Chapter 6 | Commissioning and programming PV Solar package...
Check that the glass, reverse and aluminium frame are undamaged. Check that all electrical wiring and connections are intact and not coated with anything. Mechanical cleaning is not usually required and is not recommended. PV Solar package Chapter 7 | Maintenance...
Tel: +7 831 419 57 06 E-mail: kuzmin@evan.ru www.nibe-evan.ru NIBE AB Sweden, Box 14, Hannabadsvägen 5, SE-285 21 Markaryd Tel: +46 (0)433 73 000 E-mail: info@nibe.se www.nibe.se For countries not mention in this list, please contact Nibe Sweden or check www.nibe.eu for more information.
Need help?
Do you have a question about the PV Solar package and is the answer not in the manual?
Questions and answers