Nibe PV 3031 3 kW Installer Manual

Nibe PV 3031 3 kW Installer Manual

Pv solar package

Advertisement

Quick Links

Installer manual
PV Solar package
Accessories
IHB GB 1608-2
331737

Advertisement

Table of Contents
loading

Summary of Contents for Nibe PV 3031 3 kW

  • Page 1 Installer manual PV Solar package Accessories IHB GB 1608-2 331737...
  • Page 3: Table Of Contents

    Table of Contents 1 Important information 4 Mounting Symbols 5 Electrical connection Marking Recovery Outline diagram Copyright 6 Commissioning and program- Contact information ming 2 Delivery and handling Guided first commissioning Country setting Delivery Programming Handling Contents 7 Maintenance Supplied components Service 3 Installation 8 Technical specifications...
  • Page 4: Important Information

    This symbol indicates tips on how to facilitate using the product. Marking The CE marking means that NIBE ensures that the product meets all regulations that are placed on it based on relevant EU directives. The CE mark is obligat- ory for most products sold in the EU, regardless where they are made.
  • Page 5: Contact Information

    NIBE Energy Systems France Sarl, Zone industrielle RD 28, Rue du Pou du Ciel, 01600 Reyrieux Tel : 04 74 00 92 92 Fax : 04 74 00 42 00 E-mail: info@nibe.fr www.nibe.fr NIBE Energy Systems Ltd, 3C Broom Business Park, Bridge Way, Chesterfield S41 9QG Tel: 0845 095 1200 Fax: 0845 095 1201 E-mail: info@nibe.co.uk www.nibe.co.uk...
  • Page 6: Delivery And Handling

    Contents Material PV 3031 3 kW PV 3063 6 kW PV 3093 9 kW Polycrystalline silicon cell panels 12 x 22 x...
  • Page 7: Supplied Components

    Supplied components Roof brackets with T bolts (M8x25 mm, stainless steel) and Mounting plate 300x100x12 mm self-locking nuts (M8, stainless steel) Seam mounting plate 180x60x53 mm Screw pin M10x250 mm Mounting rail Centre clamp Joint profile L profile End clamp PV Solar package Chapter 2 | Delivery and handling...
  • Page 8: Installation General

    3 Installation If there is a risk that the snow will slide down onto the General panels and in particular behind the rear of raised pan- els, snow guards must be installed to prevent this. The installation must only be carried out by competent personnel.
  • Page 9: Installation And Positioning

    Installation and positioning 1000 1000 South 1050 1000 1050 The diagram above shows solar radiation in percentage of global radiation in relation to some differently ori- entated and angled surfaces. The map shows lines with the same global radiation, that is the solar radiation measured at horizontal sur- faces.
  • Page 10: Mounting

    4 Mounting Overview The adjacent image illustrates when PV Solar package is installed on a house roof. NOTE Ensure that the strength and load capacity of the roof structure are sufficient. NOTE If there is not a sufficiently stable substructure such as tongue and groove or trusses to allow a durable installation the roof must be rein- forced.
  • Page 11 Remove the roof tiles Mark out the positions for the roof brackets using chalk. Remove or slide up the marked roof tiles. Installing the roof brackets in the eaves Secure each roof bracket in the eaves with 3 x wood screws (6x80 mm).
  • Page 12 Adapting roof tiles Use an angle grinder or hammer to make a cut out in the part of the roof tile that covers the roof bracket, so that the roof tile can lie flat against the roof base. It may also be necessary to make a cut out in the roof tile underneath.
  • Page 13 x 10 2. Install the L profile on the protruding coach bolt Nut M10 with M10 nuts. L profile Flashing tape Rubber washer Caution The coach bolt should be installed from un- derneath before the plate is mounted on the roof.
  • Page 14 Join the mounting rails Slide the joint section with rivets into the mounting rails until it presses against the rivet (A). Slide the next mounting rail in until that also presses the rivet (B). Leave 2 mm space to compensate for linear expansion. Caution To allow for thermal expansion, a break in the panel system is recommended every...
  • Page 15 Installing solar panels in the first (bottom) Position the first solar panel on the mounting rail. Click the first (bottom) row end clamp into place 5 mm from the end of the mounting rail. Secure the solar panel with the end clamp screw, tighten to 8 Nm.
  • Page 16: Electrical Connection Outline Diagram

    5 Electrical connection Outline diagram Own use 230 V Inverter Electrical distribution unit Solar panels Energy meter Mains network *Exception 3 kW single phase. On the reverse of the solar panels there is a factory installed connection box prepared with wiring for positive and negative connections.
  • Page 17 Installing solar panels in several groups Examples of possible combinations per twelve panels To reduce the risk of damage to the electric cables between the groups of solar panels, these can be run underneath the roof tiles or ceiling. To prevent moisture penetrating under the roof tiles or through the damp barrier at the holes for the electrical cables, diffusion sealed lead-ins must be fitted.
  • Page 18 Connecting inverters For installation, connection and operation of inverters, see the manual supplied. Cable routing Cable with pre-installed connectors (14 m) is supplied and can be used for roof installation. Grounding solar panels Solar panels should be earthed in the inverter or an external junction box. Lightning protection For information regarding lightning protection see page 8 under "Installation".
  • Page 19: Commissioning And Programming

    6 Commissioning and programming NOTE For installation and connection of the inverter, see the Installation manual and directions for use for the relevant inverter. Guided first commissioning A commissioning wizard helps you to implement the first commissioning. The following is set: Display language ■...
  • Page 20: Programming

    Programming Start the first commissioning The display shows the commissioning start page. Long press. Following page is displayed. Select language 1. Press to mark a language. 2. Short press. 3. Long press. Set date 1. Press to mark a date format. 2.
  • Page 21 4. Short press. The hours flash. 5. Press. The minutes are marked. 6. Short press. 7. Press. The minutes are marked. 8. Repeat points 4 to 6 for the minutes. 9. Long press Set country NOTE The country can only be set once! 1.
  • Page 22: Maintenance

    7 Maintenance Service The solar panels must be regularly inspected. Check that the glass, reverse and aluminium frame are undamaged. Check that all electrical wiring and connections are in- tact and not coated with anything. Mechanical cleaning is not usually required and is not recommended.
  • Page 23: Technical Specifications

    8 Technical specifications PV Module PV3031 3kW PV3063 6kW PV3093 9kW Rated output at STC (Pmpp) Rated voltage (Umpp) 30.5 Rated current (Impp) 8.53 External; dimensions (LxWxH) 1640x992x40 Version with aluminium frame Anodised silver Weight solar panel Connection cables with pre-installed con- 2x1000 nectors Inverter, external dimensions (LxWxH)
  • Page 24: Index

    9 Item register Item register Contact information, 5 Lightning protection/potential compensation, 8 Marking, 4 Safety information Contact information, 5 Marking, 4 Symbols, 4 Safety instructions, 8 Static load, 8 Symbols, 4 Chapter 9 | Item register PV Solar package...
  • Page 28 WS name: -Gemensamt WS version: a156 (working edition) Publish date: 2016-03-01 06:43 NIBE AB Sweden Hannabadsvägen 5 Box 14 SE-285 21 Markaryd info@nibe.se www.nibe.eu 331737...