Page 1
Operations Manual for the ASEA Power Systems Model AC90LC-3, AC100LC-3, and AC125LC-3, 3 Phase Shore Power Converters (for Motor Yachts) P/N 617050 Rev. A Issued 7/19/2013...
LIFE SUPPORT POLICY ASEA Power Systems does not authorize the use of any of its products or systems for use an AC voltage supply (source) for life support systems. Life support systems are devices which support or sustain life, and whose failure to perform, when properly used in accordance with this Operations Manual, can be reasonably expected to result in significant injury to the user.
If any questions arise while reading this manual, the user is encouraged to call ASEA Power Systems. ASEA Power Systems is located at: ASEA Power Systems 15602 Commerce Lane Huntington Beach, CA.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..TABLE OF CONTENTS WARRANTY ..........................2 USING THIS MANUAL .....................3 SAFETY NOTICES ......................6 INTRODUCTION TO THE CONVERTERS ..............8 SPECIFICATIONS ......................11 ELECTRICAL SPECIFICATIONS ...............11 4.1.1 Input Service ....................11 4.1.2 Output Service ...................12 4.1.3 Control, Metering, and Status ..............12 PHYSICAL SPECIFICATIONS ................13...
Page 5
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..SOFTWARE FEATURES ....................43 GENERAL ......................43 LOAD MANAGEMENT ..................43 LOAD MANAGEMENT OPERATION ...............45 7.3.1 Shore Cord Alarm, Single, Master, and Slave converters ......45 7.3.2 Shore Cord Setup, Single, Master, or Slave Converters ......46 7.3.3 Voltage Droop, Single or Master Converters ..........47 7.3.4 Automatic Transfer to Generator, Single or Master Converters (Seamless...
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..SAFETY NOTICES Each shore power converter is capable of transferring large amounts of electrical energy very quickly. This quality is fundamental to a high performance power converter. International symbols are used throughout this manual to stress important information. Read the text below each symbol carefully and use professional skills and prudent care when performing the actions described by the text.
Page 7
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual.. THIS EQUIPMENT CONTAINS HIGH ENERGY, LOW IMPEDANCE CIRCUITS! LETHAL POTENTIALS ARE CONTAINED WITHIN THE SYSTEM EVEN WHEN IT APPEARS TO NOT BE OPERATING. CARE MUST BE EXERCISED WHEN SERVICING THIS EQUIPMENT IN ORDER TO PREVENT SERIOUS OPERATOR INJURY OR EQUIPMENT DAMAGE.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..3 INTRODUCTION TO THE CONVERTERS The AC90LC-3, AC100LC-3, and AC125LC-3 are high performance Shore Power Converters. These models are internally oil-cooled, where a customer-managed water cooling loop carries away heat energy from the cooling oil via a base-mounted heat exchanger. The main oil reservoir is sealed to the point that it is splash-proof;...
Page 9
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..Being a converter designed from the ground up specifically for the yachting industry, all efforts have been made to produce a system capable of withstanding the marine environment. All system components are packaged in one drip-proof, dust-resistant stainless steel enclosure. Major components are internally modular, allowing a simple exchange in the unlikely event of failure.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..System cooling is accomplished through a primary, oil-to-water based exchange system as well as a supplemental forced-air cooling system. The main isolation transformer and output filter inductors are immersed in an oil which then circulates through cooling plates where input rectifiers and output transistors (IGBTs) are mounted.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..SPECIFICATIONS ELECTRICAL SPECIFICATIONS Parameter AC90LC-3 AC100LC-3 AC125LC-3 4.1.1 Input Service Input Power Form Three Phase Three Phase Three Phase Input Voltage Range 330-520V 330-520V 330-520V Input Frequency Range 40-70 Hertz 40-70 Hertz 40-70 Hertz Input Current, Max.
Ensure the installation room or compartment has adequate ventilation and cooling. The thermal load presented by the converter through air exchange will be approximately the following at maximum continuous load: 800 BTU/Hr for the AC90LC-3, AC100LC-3, or AC125LC-3. THE CONVERTERS ARE HEAVY, WEIGHING UP TO 1916lbs DEPENDING UPON MODEL AND INSTALLED OPTIONS.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..MECHANICAL INSTALLATION The converters were designed for deck mount installations and as such are provided with six mounting holes, three per side. Mounting holes have been provided with 1/2" (12.7mm) diameters; stainless steel hardware in the range of 3/8" to 7/16" (10-11mm) diameter is required.
Isolation valves must be installed locally for maintenance purposes, and so that shutoff can occur in the event of a water leak. The ASEA-supplied Flow Control Solenoid must be installed and located within 24" of the bottom right front corner of the converter as dictated by the supplied control cable length.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..ELECTRICAL INSTALLATION This procedure assumes the physical installation of the converter has been completed. It is the installer’s responsibility to provide input service over-current protection and disconnect means. It is recommended that connection be made to the distribution bus through a manually operated...
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..ELECTRICAL INSTALLATION, cont. INPUT WIRING MUST BE PERFORMED BY A QUALIFIED ELECTRICIAN FAMILIAR WITH STANDARD SAFEGUARDS AND PROCEDURES REQUIRED BY THE INSTALLATION OF THIS TYPE OF EQUIPMENT. POWER MUST BE REMOVED FROM THE INPUT DISTRIBUTION SYSTEMS SUPPLYING POWER TO THE AC90LC- 3, AC100LC-3, OR AC125LC-3 PRIOR TO THE START OF THE FOLLOWING STEPS.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..ELECTRICAL INSTALLATION, cont. FIGURE 7 INPUT AND OUTPUT CONNECTIONS Prepare the power cables by removing approximately 6” of the outer cable insulation (in the case of SO type portable cables). Strip the insulation back exposing the appropriate amount of the bare conductor for the chosen 3/8”...
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..ELECTRICAL INSTALLATION, cont. 5.3.3 Grounding The converter chassis ground MUST be connected to the ship’s hull or common ground point via the 3/8” ground stud adjacent to the output power connections. Failure to do so may create conditions that may in turn cause injury or death to operators;...
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..ELECTRICAL INSTALLATION, cont. 5.3.4 Multi-Cabinet Connections Multi-cabinet systems should have each cabinet’s output connections paralleled at the switchgear panel. The converters’ terminal blocks are sized for a single, appropriated sized cable per phase, neutral, and grounding conductor.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..ELECTRICAL INSTALLATION, cont. 5.3.5 Seamless Transfer Connections If the Seamless Transfer Option was ordered with the system, connections must be made between the generator/switchgear and converter. These connections are used by the converter to successfully manage Seamless Transfer operation and are comprised of control, signal, and feedback functions.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..ELECTRICAL INSTALLATION, cont. 5.3.6 Other Optional Connections In support of the Seamless Transfer Option, or in support of switchgear and/or power monitoring integration, other options may be ordered and installed in a converter. Installation requirements for such options vary in accordance with switchgear design and hence are beyond the scope of this Operations Manual.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..OPERATION POWER TURN-ON PROCEDURE Close the shore power (input) circuit breaker or switch to the converter. Turn the disconnect (14) switch to the ON position. After 1-3 seconds, fans will be heard, and the display will become active.
Page 29
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..POWER TURN-ON PROCEDURE, cont. The display will sequence to the SUMMARY DISPLAY indicating the converter’s operational state. Both input and output (converter) should indicate OFFLINE at this time. Press the INFO (13) button to review the Shore Power state if desired. The INFO screen will either list the Shore Power as ONLINE or give a reason for its being off if it was previously on.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..POWER TURN-ON PROCEDURE, cont. Press the CONVERTER POWER (4) button and the screen will now change. As with the shore power displays, the F1-F4 (13) buttons will cycle through a variety of converter power data. Output voltages and currents should indicate zero.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..POWER TURN-ON PROCEDURE, cont. 6.1.2 Systems Equipped With The Seamless Transfer Option With the converter in the Standby State (as left at the end of Section 6.1), press the GENERATOR POWER (3) display button. The generator voltage and form will now be displayed.
Page 32
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..POWER TURN-ON PROCEDURE, cont. 6.1.2 Systems Equipped With The Seamless Transfer Option, cont. If the generator is supplying power to the ship, the SHIP’S POWER - GENERATOR LED (12A) is lit, and the GENERATOR metering display indicates approximately the same voltage as the CONVERTER metering display, then proceed by pressing the SHIP’S POWER - CONVERTER...
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..MULTI-CABINET OPERATION Multi-cabinet systems are operated from the Master’s control panel. Each cabinet retains its own control panel and metering display for individual monitoring. A load management option exists that allows individual cabinets to load according to shore cord size (see section 7 for details).
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..AUTO-RESTART FEATURE The Auto-Restart feature will safely and automatically bring the shore power converter back on- line following a power failure and recovery event. Highlights include: Automatically routes power from the dock to the ships power buss.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..AUTO-RESTART FEATURE, cont. 6.3.1 Operation Auto-Restart must be enabled from the converter front panel by simultaneously pressing two buttons. Anytime the system status is “FAILURE,” the converter will disable the Auto-Restart feature. The converter must be ON and ONLINE before Auto-Restart may be enabled. Pressing the SYSTEM STATUS button (5) will display the SUMMARY DISPLAY which will indicate the Auto-Restart status.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..TURN-OFF PROCEDURE 6.4.1 Systems Not Equipped With The Seamless Transfer Option Transfer power from the converter to the generator. This must be performed in a “break-before- make” method, that is, at no time can the generator(s) and shore power converter be operated in parallel.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..6.4.2 Systems Equipped With The Seamless Transfer Option The generator must be started and be prepared to accept the ship’s electrical loads. Measure the generator voltage using the converter’s metering display, selecting the GENERATOR POWER (3) function.
The two software protocols supported by the converter are SCPI and Modbus. Please contact an ASEA Power Systems authorized distributor or the factory for additional information and comprehensive command/query listings. The Baud Rate and fixed serial port settings can be viewed in the REMOTE INTERFACE CONFIGURATION DISPLAY (as depicted below) by pressing the SYSTEM STATUS (5) and F3 (13) buttons simultaneously.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..REMOTE COMMUNICATIONS, cont. 6.5.1 RS-232C/SCPI The RS-232C serial port is located at the base of the Control PCB box just above the heat exchanger. The RS-232C TxD signal originating in the converter is approximately +15V when “High” and -15V when “Low.”...
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..REMOTE COMMUNICATIONS, cont. 6.5.2 RS-485/Modbus If included in the converter, a Modbus Option converter/optical-isolator will be located adjacent to the RS-232C serial port. The Modbus Option included converter/optical-isolator connections are depicted in Figure 11 below.
Page 41
ASEA Power Systems designed Touch Panel computers. Additional slave converters can be set for Node Id numbers greater than 4 (5-8 recommended). As ASEA Power Systems uses Node Id numbers 9-13 for GMM products, use of these should be avoided.
Page 42
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..This page intentionally left blank...
SOFTWARE FEATURES GENERAL ASEA Power Systems' shore power converters provide a variety of software-based resources. Each major function is described in detail in the following pages. BOLD upper-case text indicates when a display button is being referenced. Where two buttons are given as BUTTON + BUTTON, the buttons must be pressed simultaneously.
Page 44
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..LOAD MANAGEMENT, cont. Voltage Droop If the yacht’s electrical system does not include a power management system that allows for automatic load-shed, the converter’s Voltage Droop feature may be used to save up to 10% capacity by reducing the converter output voltage up to 5% (1% to 5% range).
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..LOAD MANAGEMENT OPERATION 7.3.1 Shore Cord Alarm, Single, Master, and Slave converters If the yacht’s electrical system includes a power management or load-shed feature, the Shore Cord Alarm can be used to effect a change in loading when the converter reaches a programmed load threshold, or simply draw the yacht engineer’s attention.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..LOAD MANAGEMENT OPERATION, cont. 7.3.2 Shore Cord Setup, Single, Master, or Slave Converters The Shore Cord Setup screen is used to set the actual shore cord ampacity based on the marina’s dock or pedestal circuit breaker. The converter’s new, programmed CONV. CAPACITY is then displayed for reference.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..LOAD MANAGEMENT OPERATION, cont. 7.3.3 Voltage Droop, Single or Master Converters Upon Shore Alarm, the Voltage Droop feature may be used to save up to 10% converter capacity by reducing the converter output voltage up to 5%. This is offered as a solution where the yacht does not already have power management and load-shed capabilities that can be triggered with the Shore Cord Alarm signal.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..LOAD MANAGEMENT OPERATION, cont. 7.3.4 Automatic Transfer to Generator, Single or Master Converters (Seamless Transfer installed) Upon Shore Alarm, the Automatic Transfer to Generator feature may be used to perform a Seamless Transfer to a pre-selected generator. This implies connection and setting of the Generator Autostart Control feature (needed to signal a generator to start and hold the set warm-up time before transferring).
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..LOAD MANAGEMENT OPERATION, cont. 7.3.5 Quick Setup of Shore Cord Alarm, Single, Master, or Slave Converters 1. Turn on the red Disconnect switch of both converters and wait 15-20 seconds for initialization. 2. Press the SHORE POWER + F2 buttons on both converters.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..GENERATOR FREQUENCY ANALYSIS Press the SYSTEM STATUS + GENERATOR POWER buttons to access the Generator Frequency Analysis Display. Used for observing lifetime generator frequency range. GENERATOR FREQUENCY ANALYSIS DISPLAY Generator MIN Frequency: XX.XXHz Generator MAX Frequency: XX.XXHz...
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..AGC CONTROL Press the SHORE POWER + F4 buttons to access the Automatic Gain Control (AGC) CONTROL display. AGC CONTROL SCREEN Automatic Gain Control is: ENABLED Enable Disable Exit This function enables or disables AGC. Press the Enable (F1) button to enable the feature, the Disable (F2) button to disable the feature, and the Exit (F5) button to save the settings and exit.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..kW-HOUR METER AND MAXIMUM POWER LEVEL DISPLAY Press the SHORE POWER + CONVERTER POWER buttons to access the Automatic KW-HOUR METER and maximum power level display. KW-HOUR METER kW-Hours:XXXXXXX.XX Run Time. XX:XX:XX:XX Max. Level: XXX.X% Max.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..CONVERTER OUTPUT VOLTAGE CONTROL Press the CONVERTER POWER + F5 buttons to access the CONVERTER OUTPUT VOLTAGE CONTROL display. CONVERTER OUTPUT VOLTAGE CONTROL Vout = XXX.X More Less XXXV Exit This function allows the user to increase or decrease the converter output voltage (Vout). Press the...
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..EVENT LOG Press the EVENT LOG (or CALIBRATE on older converters) button to access the EVENT LOG display. EVENT LOG CONTROL SCREEN F1: EVENT LOG VIEWER XXXX Events F2: EVENT LOG TRACKER F3: EVENT LOG REGISTRY This is for monitoring internal converter logic operation.
Page 55
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..EVENT LOG, cont. Press the F3 button to access the EVENT LOG REGISTRY display. EVENT LOG REGISTRY PRESS: ‘SHORE POWER’ to edit Registry, The ‘F1’ for log On & ‘F2’ for log Off. Press: ‘F4’ to CLEAR EVENT LOG.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..DIAGNOSTICS As previously described in paragraph 6.1, the converter’s LCD display will initiate on turn-on in the SUMMARY DISPLAY indicating the converter’s operational state. Return to this screen at any time by pressing the SYSTEM STATUS (5) button. In the event of a converter failure or over- temperature condition, “WARNING”...
Page 57
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..DIAGNOSTICS, cont. To aid in system diagnostics, three status words have been provided in the STATUS WORD DISPLAY which is accessed by pressing the SYSTEM STATUS (5) and F2 (13) buttons simultaneously. BIT: FEDCBA9876543210...
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..CALIBRATION In an uncalibrated state the input and output voltage and input current metering system should be within 3%. The uncalibrated output current meter is normally 5% low. For calibration an external reference voltmeter will be required along with a calibrated current transformer or probe. If the system is to be calibrated on board using the yacht’s loads, attempt to shut down all transient...
Page 60
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..CALIBRATION, cont. - The CONVERTER POWER calibration works in a fashion Converter Power Calibration similar to the SHORE POWER calibration described above. Press and hold the CONVERTER POWER (4) button for 7 seconds, or until the converter power calibration display appears. Move the reference meter probes from the input to the output terminal blocks.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..MAINTENANCE Due to the design and construction of the converter, preventative maintenance is held to a modest level. The following table lists minimum recommended tasks and frequency. TASK FREQUENCY COMMENTS Tighten electrical connections Every 6 months Must be adjusted by the user based upon experience in the environment.
AC90LC-3, AC100LC-3, and AC125LC-3 Operations Manual..INTERNATIONAL POWER FORM REFERENCE Country Frequency Nominal Voltage Comments American Samoa 60Hz 120/240 277/480 Antigua 60Hz 230/400 Argentina 50Hz 220/380 Aruba 60Hz 127/220 115/230 Australia 50Hz 240/415 250/435 Azores 50Hz 110/190 220/380 Bahamas 60Hz...