Spectron spectropur E71-VCR User Manual

Spectron spectropur E71-VCR User Manual

Pressure regulator

Advertisement

Quick Links

User manual
Pressure regulator
E71-VCR
02/2022

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the spectropur E71-VCR and is the answer not in the manual?

Questions and answers

Summary of Contents for Spectron spectropur E71-VCR

  • Page 1 User manual Pressure regulator E71-VCR 02/2022...
  • Page 2: Table Of Contents

    Contents Spectron Gas Control Systems GmbH Contents 1 Introduction..............................2 Description..............................2.1 Intended use ............................2.2 Misuse ..............................2.3 Identification / label ..........................2.4 Environment............................2.4.1 Temperatures..........................2.4.2 Degree of cleanliness ........................ 2.4.3 Emissions........................... 2.5 Standards and laws ..........................3 Safety................................
  • Page 3: Introduction

    Introduction | 1 1 Introduction This user manual is the original user manual for the Pressure regulator E71-VCR from Spectron Gas Control Systems GmbH, referred to as Spectron. The user manual is intended to facilitate correct and safe operation for the operating firm, and to warn against misuse.
  • Page 4: Description

    2 | Description Spectron Gas Control Systems GmbH 2 Description 2.1 Intended use Pressure regulator of type E71-VCR are suitable for flammable gases, non-flammable gases, oxygen as well as for ultra high purity gases from gas quality 6.0. Depending on the equipment variant, the Pressure regulator are suitable for the following types of gases: –...
  • Page 5: Environment

    Spectron Gas Control Systems GmbH Description | 2 2.4 Environment 2.4.1 Temperatures Normal temperatures expected in a production area are assumed when operating the system: -20°C to +60°C. The air humidity must be below 60 % rel. humidity to prevent condensation. The operating tem- perature depends on the gas used.
  • Page 6 2 | Description Spectron Gas Control Systems GmbH EIGA documents GES_E71-VCR_0222...
  • Page 7: Safety

    Spectron Gas Control Systems GmbH Safety | 3 3 Safety 3.1 Basic information on the safety instructions The product complies with the recognised technical regulations. Nevertheless, knowledge of the media used and their dangers as well as basic knowledge of the pressure control panel are pre- requisites for safe and accident-free operation.
  • Page 8: Safety Instructions

    3 | Safety Spectron Gas Control Systems GmbH 3.2 Safety instructions The safety instructions are to be observed by all persons working on the system. The rules and regulations for accident prevention applicable to the place of use are to be observed. The in- struction of the operating and maintenance personnel on system safety must be documented.
  • Page 9 Spectron Gas Control Systems GmbH Safety | 3 WARNING Repairs If the product is not used as intended, unpredictable operating conditions may occur. Serious personal injuries are possible. a) Repairs may not lead to a change in function. The system may not be tampered with or modified.
  • Page 10: Emergencies And Safety Devices

    3 | Safety Spectron Gas Control Systems GmbH NOTICE Lighting Incorrect switching actions or confusion can occur due to inadequate lighting. a) Ensure sufficient lighting in accordance with the statutory regulations. 3.3 Emergencies and safety devices The operational local safety regulations of the system operator, such as the alarm plan, fire safety regulations and the escape and rescue plans, apply in all cases for the operation of the Pressure regulator.
  • Page 11: Design And Function

    Spectron Gas Control Systems GmbH Design and function | 4 4 Design and function 4.1 Design Illustration 1: Pressure regulator design E71-VCR The design described is an example. The product design may vary depending on the configura- tion. Item Description Short name...
  • Page 12: Functional Description

    (incl. power supply) are the connections on the pressure control panel or product. The following areas and functions have not been included in the scope of supply from Spectron: – other systems, lines and installations of the overall system –...
  • Page 13 Spectron Gas Control Systems GmbH Design and function | 4 – Lighting – Controller GES_E71-VCR_0222...
  • Page 14: Installation

    5 | Installation Spectron Gas Control Systems GmbH 5 Installation 5.1 General information CAUTION Injury or damage in the event of incorrect assembly or disassembly Special steps are required for assembly and disassembly work on the product. Personal injuries and damage to the product are possible.
  • Page 15: Commissioning

    Spectron Gas Control Systems GmbH Commissioning | 6 6 Commissioning 6.1 Preparations for commissioning Purge the armature prior to initial commissioning! It is imperative to adhere to the direction of the gas flow when doing this! You must not purge counter to the usual direction of flow (from the tapping point to the process gas source), as this can flush debris resulting from the installation work, for example, back into the armature.
  • Page 16: Maintenance, Cleaning And Repairs

    7 | Maintenance, cleaning and repairs Spectron Gas Control Systems GmbH 7 Maintenance, cleaning and repairs 7.1 General information on maintenance WARNING Noise emission When working on pressurised pneumatic supply, significant noise emission can occur. Acute and chronic loss of hearing may result.
  • Page 17: Regular Maintenance Work And Cleaning

    Spectron Gas Control Systems GmbH Maintenance, cleaning and repairs | 7 CAUTION Injury or damage in the event of incorrect assembly or disassembly Special steps are required for assembly and disassembly work on the product. Personal injuries and damage to the product are possible.
  • Page 18: Dismantling And Disposal

    6. Pack the product. 8.2 Returns If products are returned to Spectron for checking, maintenance or repair, it is essential to purge them with inert gas. A check can only be undertaken by Spectron if the repair pre-registration including the decontamination declaration has been duly completed.
  • Page 19: Disposal

    Spectron Gas Control Systems GmbH Dismantling and disposal | 8 8.3 Disposal Dismantling and disposal must be carried out in accordance with the official and legal require- ments at the site of the system. The operator must produce a risk assessment and work instruc- tions before dismantling.
  • Page 20 Spectron Gas Control Systems GmbH Fritz-Klatte-Str. 8 D-65933 Frankfurt Tel: +49 (0)69 38016-0 Fax: +49 (0)69 38016-200 info@spectron.de www.spectron.de...

Table of Contents