RTU Air Purification System! Healthy, and Clean SecureAire’s Patented ACTIVE Particle Control™ Technology removes airborne contaminants while INACTIVATING™ Environment™ (killing) viable airborne pathogens including bacteria, viruses and mold. www.secureaire.com | Proudly made in the U.S.A. | ACS Slim Line-Rev A...
Not included: • Electrical conduit, wiring and conduit junction boxes • All appropriate control wiring • 2” U - channel (Nominal 2” ID, and 0.45” ID rise) www.secureaire.com | Proudly made in the U.S.A. | ACS – Slim Line-Rev A...
STEP 2: Slide the first ACS – Slim Line filter (Item B) into the 2” U-channel. The first unit is the one that contains the “Protection Plate” (Item A) which has been factory installed.
Page 4
ACS – Slim Line System Installation Phase 3: Powering Up the ACS – Slim Line System Basic electrical skills are needed to power up the ACS – Slim Line System to the SCM-300C Power Supplies, Safety Interlock Door Switches, and building automation system.
Page 5
STEP 2: Locate and mount the System Control Module (SCM-300C) within 12 feet of the Connection Plate, which is now attached and located at the end of each row of the ACS – Slim Line. STEP 3: Install the included SPDT (120 Vac) Safety Interlock Door Switch to all access doors and wire the input power line voltage circuit to interrupt the circuit so that the ACS –...
Page 6
NOTE: If the Auxiliary Blower Contact Circuit is not used, simply wire nut together both the yellow and purple wires. www.secureaire.com | Proudly made in the U.S.A. | ACS – Slim Line-Rev A...
Page 7
95% are acceptable but direct contact with the maintained from any metallic objects or elements are not. surfaces from the ACS – Slim Line units and racking system. www.secureaire.com | Proudly made in the U.S.A. | ACS – Slim Line-Rev A...
Page 8
SCM 300Cs will not be affected. If an ACS – Slim Line System is going to be accessed, the amount of time to be allowed for discharge after removing power and before accessing the grid assembly is approximately 30 seconds. It is recommended that verification of high voltage be performed (using a high-voltage meter or other suitable indicator) prior to working on or near the grid assembly.
Page 9
(iv) be repaired other than by SecureAire or an Authorized SecureAire Services Representative, or (v) be repaired using parts other than those supplied by SecureAire, or (vi) be used with non-SecureAire filter media, or (vii) be damaged due to acts of war or terrorism. Additionally, this limited warranty shall not apply if purchaser has not paid all invoiced amounts due.