ACS
S ystem
P arts
L ist
ACS Filter(s), SCM-200 Unit(s), Connection Plate(s), Connecting Screws and Nuts, Protection • Plate(s), SCM Protection Shield(s), High Voltage Wire(s) and Racking System Hardware. All appropriate control wiring.
Installation
O verview
The
A CS
S ystem
n eeds
t o
b e
i nstalled
b y
a n
H VAC
M echanical
C ontractor
a nd
a
l icensed
electrician.
...
Page 5
Installing
a
F ront
L oad
S ecureAire
A CS
S ystem
Step
1 :
Plan
t he
l ayout
o f
t he
A CS
F ilters
b y
m arking
t he
f loor
o f
t he
A HU.
B e
s ure
t o
consider
...
Page 6
B. Insert
t he
C ollector
B racket
o nto
b oth
t he
t op
a nd
b ottom
o f
t he
C ollector
F rame
a s
shown
...
Page 7
( 4)
# 6-‐19
x
¼ ”
S ST
s crews
f or
e ach
P rotection
P late.
Figure 4: Protection Plate attached to the AHU wall end of the ACS.
Page 8
ACS
F ilter
u nits
w ill
h ave
a
S ingle
R ail
S tructure.
T hese
u nits
a re
c onnected
...
Page 9
Note:
W hen
c onnecting
t wo
A CS
R ail
S tructures
t ogether
t he
s ix
m ale
a nd
f emale
contact
...
Page 10
Figure
8 :
R ear
s ide
o f
A CS
S tructure
w ith
R ack
L ink
B rackets
D. Once
a
c olumn
o f
A CS
F ilters
h as
b een
i nstalled,
t hey
a re
a ttached
t o
t he
c eiling
o f
t he
AHU
...
Page 11
Note:
S hould
a ny
g aps
i n
t he
R acking
S tructure
e xist,
t he
i nstalling
c ontractor
s hould
u se
the
...
Page 12
Figure
1 1:
S CM-‐200
a nd
S afety
I nterlock
D oor
S witch
W iring.
Care
s hould
b e
t aken
t o
m ake
s ure
t hat
t he
i nstallation
o f
t he
a ppropriate
l ocal
building
...
1. Make sure no metal, including metal shavings or screws, gets placed or lodged in the ACS as this can create an electrical short and cause a failure condition in the ACS or SCM-200’s thus preventing the system from proper operation.
SCM-200 will turn itself off. All other SCM- 200’s will not be affected. If an ACS System is going to be accessed, the amount of time to be allowed for discharge after removing power and before accessing the grid assembly is approximately 30 seconds. It is recommended that verification of high voltage be performed (using a meter or other suitable indicator) prior to working on or near the grid assembly.
Need help?
Do you have a question about the ACS and is the answer not in the manual?
Questions and answers