Download Print this page

scope ActiveCore User Manual page 2

Advertisement

Installation Guidelines
When installing this freezer, ensure the installation guidelines below are considered and met
Ventilation
The installation surface
Ensure all ventilation
must be capable of
requirements below are
met.
supporting the loaded
Uneven Surface
Sunlight
Do not install the freezer
Do not install the freezer
on an uneven surface.
in direct sunlight.
Ventilation Requirements
300 mm
Min.
above*
Vented top sign*
No side
clearance
required
No below clearance required
This freezer must have the following ventilation clearances at all times. In certain climatic conditions, condensation may
form on the back of the cabinet. If this is observed, ensure air circulation between cabinet and wall by adhering two of the
enclosed self-adhesive blocks to the cabinet back as shown.
Freezer
Surface
Door Opening
Allow adequate space for
the door/s to open and
close properly.
cabinet.
Power Supply
Do not overload the power
supply.
300 mm
Min.
Rear top sign*
No behind
clearance
required
Climate Class
The freezer must be
installed in an environment
within its climate class.*
The climate class is stated
on the cabinet rating label
inside the freezer, and
specified on the back page
of this user guide.
Blocking Ventilation
Do not store boxes or items in
front or on top of the freezer.
above*
Adhesive Blocks
If required use two adhesive blocks on the rear of the cabinet. Position
the blocks on the left and right hand sides of the cabinet, approximately
in the centre and 50 mm from the cabinet edge
Refrigeration
Refrigeration
.
50mm
.

Advertisement

loading