Start Up Checklist - Amana M9C96 Series Manual

Two-stage gas furnaces
Table of Contents

Advertisement

Furnace
Line Voltage (Measure L1 to N and N to Ground Voltage)
Secondary Voltage (Measure Transformer Output Voltage)
Blower Amps
BLOWER EXTERNAL STATIC PRESSURE
Return Air Static Pressure
Supply Air Static Pressure
Total External Static Pressure (Ignoring +/- from the reading above, add total here)
Return Air Temperature (Dry bulb / Wet bulb)
Cooling Supply Air Temperature (Dry bulb / Wet bulb)
Heating Supply Air Temperature
Temperature Rise
Delta T (Difference between Supply and Return Temperatures)
Gas Inlet Pressure
Gas Manifold Pressure (Low Fire)
Gas Manifold Pressure (High Fire)
Gas Type (NG) = Natural Gas / (LP) = Liquid Propane
Additional Checks
Check wire routings for any rubbing
Check for kinked pressure switch tubing.
Check flue elbow for alignment and clamp tightness.
Check screw tightness on blower wheel.
Check factory wiring and wire connections.
Check product for proper clearances as noted by installtion instructions
°F to °C formula: (°F - 32) divided by 1.8 = °C
ELECTRICAL
TEMPERATURES
GAS PRESSURES
°C to °F formula: (°C multiplied by 1.8) + 32 = °F
Model Number
Serial Number
L - N
N - G
R - C
48
IN. W.C.
IN. W.C.
IN. W.C.
DB °F
WB °F
DB °F
WB °F
DB °F
DB °F
DB °F
IN. W.C.
IN. W.C.
IN. W.C.

Hide quick links: