Installations and connections
Installing the thermal recording
papar
1
Open the control panel.
Open the control
2
panel until it locks.
2
Install the recording paper.
3
Pull the paper approx. 10 cm out of the unit and
close the control panel until it locks.
Approximetely 5 cm of the recording paper will
●
come out automatically.
4
Pull up
1
here.
Control panel
Rolling core is upside
Reverse
Slack
Click
4
Pull the recording paper towards you to cut off.
Install a new thermal recording paper.
Replacement thermal recording paper:
UG-0010A4 (15 m role type)
As of June 2003.
・
・
¥450
Tax not included.