4B IE-NODE 2 Operation Manual

Industrial ethernet node 10 analog 4-20 ma inputs
Hide thumbs Also See for IE-NODE 2:

Advertisement

Quick Links

IE-NODE
INDUSTRIAL ETHERNET NODE 2
10 ANALOG 4-20 mA INPUTS
COMMUNICATION PROTOCOLS -
PROFINET, ETHERNET/IP & MODBUS TCP/IP
EN - FR - CN - RU
INSTALLATION INSTRUCTIONS
OPERATION MANUAL
Part No.'s - ETH-NODE2V46CAI, ETH-NODE2V4CAI
Hardware Version R3 - Software Version 4.2.4 - Ethernet 0.2.X
www.go4b.com

Advertisement

Table of Contents
loading

Summary of Contents for 4B IE-NODE 2

  • Page 1 IE-NODE INDUSTRIAL ETHERNET NODE 2 10 ANALOG 4-20 mA INPUTS COMMUNICATION PROTOCOLS - PROFINET, ETHERNET/IP & MODBUS TCP/IP EN - FR - CN - RU INSTALLATION INSTRUCTIONS OPERATION MANUAL Part No.’s - ETH-NODE2V46CAI, ETH-NODE2V4CAI Hardware Version R3 - Software Version 4.2.4 - Ethernet 0.2.X www.go4b.com...
  • Page 2 DANGER DANGER Exposed buckets and moving parts will cause severe injury or death. Lockout power before removing cover or inspection door. WARNING Moving parts can crush and cut. Lockout power before removing guard or servicing. Do NOT operate with guard removed...
  • Page 3: Table Of Contents

    TABLE OF CONTENTS 1. CUSTOMER SAFETY RESPONSIBILITIES Page 4 - 5 2. PRODUCT OVERVIEW Page 6 3. SPECIFICATIONS Page 6 4. DIMENSIONS Page 7 5. INSTALLATION Page 7 6. SENSOR PLACEMENT DIAGRAMS Page 8 7. ELECTRICAL CONNECTION Page 9 8. WIRING DIAGRAMS Page 11 - 15 8.1 Supply Voltage Wiring (120 to 240 VAC) Page 11...
  • Page 4: Customer Safety Responsibilities

    1. CUSTOMER SAFETY RESPONSIBILITIES 4B appreciates your business and is pleased you have chosen our products to meet your needs. Please read in its entirety and understand the literature accompanying the product before you place the product into service. Please read the safety precautions carefully before operating the product.
  • Page 5 Correct installation of the product is important for safety and performance. If you have not asked 4B to perform the installation of the unit on your behalf, it is critical for the safety of your operation and those who may perform work on your operation that you select a qualified and competent electrical installer to undertake the installation.
  • Page 6: Product Overview

    PROFINET, EtherNet/IP and Modbus TCP/IP protocols for easy integration with Siemens, Allen-Bradley Rockwell, Modicon and other PLC’s or automation devices. The IE-NODE can be used with the following 4B sensors: 4-20 mA Current Loop - • Milli-Speed Switch: Designed to detect belt slip, belt underspeed, stop motion, low speed or zero...
  • Page 7: Dimensions

    4. DIMENSIONS 5. INSTALLATION The IE-NODE should be installed in an area with network Ethernet access. ENCLOSURE INSTALLATION - 1. Use the correct cable, glands and sealing arrangement in accordance to local installation codes. 2. Where other certified components are used as part of the assembly or installation procedure, the user must take in to account any limitations which might be listed on the relevant certificates.
  • Page 8: Sensor Placement Diagrams

    6. SENSOR PLACEMENT DIAGRAMS TYPICAL SENSOR PLACEMENT FOR BUCKET ELEVATORS & ENCLOSED BELT CONVEYORS SPEED MONITORING Qty 1 - One sensor located on either side of the tail or boot shaft. BEARING TEMPERATURE Qty. 4 - One sensor for the bearings at each end of the drive and tail or head and boot shafts.
  • Page 9: Electrical Connection

    Additional wire used during the installation must have a temperature rating of 158° F (70° C) or above, and be at least 24 AWG. 4B recommends using shielded cable to reduce electromagnetic interference (EMI) to maintain signal integrity. Never run sensor cables in the same conduit as three phase motor cables.
  • Page 10 WARNING The unit should ONLY be powered with either a main supply (ETH-NODE2V46C model) OR a 24 VDC (ETH-NODE2V4C) NOT BOTH (see specifications). RJ45 Ethernet DIP Switches (SW2) FIELD WIRING CONNECTIONS 01 - 0 VDC 02 - CLI#1 Sensor Input Power Supply 03 - CLI#2 Sensor Input Location...
  • Page 11: Wiring Diagrams

    8. WIRING DIAGRAMS 8.1 SUPPLY VOLTAGE WIRING (120 TO 240 VAC) Connection Fuse Ground 8.2 SUPPLY VOLTAGE WIRING (24 VDC) Connection Fuse 24 VDC Ground PAGE 11...
  • Page 12: Wiring Block Diagram For Elevator & Conveyor

    8.3 WIRING BLOCK DIAGRAM FOR BUCKET ELEVATOR & BELT CONVEYOR - Hot Bearing Hot Bearing Sensor Sensor Junction TOP LEFT TOP RIGHT Alignment Alignment HEAD / DRIVE Top Left Top Right Denotes shielded INDUSTRIAL cable. Shield to IE-NODE be grounded at one end only.
  • Page 13: Standard System Sensor Wiring Diagram

    8.4 STANDARD SENSOR WIRING DIAGRAM: - MILLI-TEMP (BEARING TEMP), RUB BLOCKS (BELT ALIGNMENT) & MILLI-SPEED (SPEED) Yellow 0 VDC Black Brown CLI#1 RIGHT Bearing Top (Head) LEFT CLI#2 Orange Black Brown +24 VDC (Fuse F1) 0 VDC Yellow Black Brown CLI#3 RIGHT Bearing...
  • Page 14: Individual Bearing Temp. Sensor Wiring Diagrams

    8.5 INDIVIDUAL BEARING SENSOR WIRING DIAGRAMS: Milli-Temp 4-20 mA 0 VDC CLI# Black Brown +24 VDC 8.6 INDIVIDUAL BELT ALIGNMENT SENSOR WIRING DIAGRAMS: 4-20 mA Rub Block (Milli-Temp) 0 VDC CLI# Black Brown +24 VDC 8.7 INDIVIDUAL SPEED SENSOR WIRING DIAGRAMS: Milli-Speed (4-20 mA) 0 VDC CLI#...
  • Page 15: Ie-Node Operation

    9. IE-NODE OPERATION The Industrial Ethernet Node is designed to sample data from several sensors and provide this data to remote users or PLC’s on request. It is only a reporting system, and does not control any other system or device. 9.1 STARTUP OPERATION - After all sensor and power connections have been made, locate the POWER and HB (Heart Beat) LED’s on the IE-NODE’s control board (See Image 1).
  • Page 16: Dip Switches (Sw2)

    9.3 DIP SWITCHES (SW2) - The IE-NODE has a set of eight DIP switches to change settings (Image 3). Each switch setting is described in the table below. If a switch setting is changed, the unit must be restarted for the change to take effect.
  • Page 17: Communications Options

    FTP server to store any files as it may become problematic to perform future firmware updates if not enough free space is left on the device. Contact 4B for a copy of the firmware update guide.
  • Page 18: Ie-Node Network Configurator Software

    It allows for easy identification for each unit on the network, and allows you to change network settings as needed. The software does not ship with the unit, it is available as a free download from 4B’s website (see the IE-NODE product page).
  • Page 19 A “Network Configurator” will launch and rescan the network - Image 7 - Network Configurator Menu If nothing is found, try updating your computer’s network settings to the same IP address range as the IE-NODE and select “Refresh List”. To change the network settings of an IE-NODE, highlight it from the device list and select “Network Settings”.
  • Page 20 If you prefer to use the built-in web server on the IE-Node, you can select “Update IE-NODE Configuration Settings” icon from the main menu, or simply enter the node’s IP address into a web browser. Enter the user name “root” followed by the password “BBBB” then select “OK”. Once logged in, you will be taken to the home page on the web server.
  • Page 21 8 is in the ON (Right) position. Otherwise, the rotary switch will override the address in memory. Unless instructed by 4B, do not use “Update IE-NODE Main/Auxiliary Firmware” or “Update DIGI Module via FTP” from the IE-NODE’s Configurator Menu (Image 6) as these options are used for firmware updates.
  • Page 22: Troubleshooting Guide

    13. TROUBLESHOOTING GUIDE CONDITION SOLUTION 1. Check that power is applied to the unit on appropriate terminals (21 - 24). Power LED is Off 2. Check that the mains input fuse F6 is not damaged. 3. Check that the internal circuitry fuse F5 is not damaged. 1.
  • Page 23 END USER NOTES PAGE 23...
  • Page 24 END USER NOTES PAGE 24...
  • Page 25 END USER NOTES PAGE 25...
  • Page 26 END USER NOTES PAGE 26...
  • Page 27: Product Warranty

    AS 4B TO THE ORIGINAL PURCHASER AGAINST DEFECTS IN WORKMANSHIP OR MATERIALS UNDER NORMAL USE FOR ONE (1) YEAR AFTER DATE OF PURCHASE FROM 4B. ANY PRODUCT DETERMINED BY 4B AT ITS SOLE DISCRETION TO BE DEFECTIVE IN MATERIAL OR WORKMANSHIP AND RETURNED TO A 4B BRANCH...
  • Page 28 Wujin High & New TDZ, Australia Fax: 309-698-5615 Samutprakarn 10540 Changzhou, Jiangsu, PRC Tel: +61 (0)7 3216 9365 Thailand Tel: +86-519-88556006 Email: 4b-australia@go4b.com Tel: +66 (0) 2 173-4339 Email: 4b-china@go4b.com Email: 4b-asiapacific@go4b.com www.go4b.com Copyright © 2018 4B Group - All Rights Reserved REV030922...

This manual is also suitable for:

Eth-node2v46caiEth-node2v4cai

Table of Contents