Download Print this page

ABB VFD-GATEWAY User Manual page 22

Hide thumbs Also See for VFD-GATEWAY:

Advertisement

22
Step 6: Apply changes
Apply changes by (1) checking the 'Ready to apply' button/check box, then (2) Apply setting button:
2
1
The VFD-GATEWAY will perform a restart (communication will be lost) and the web interface will need to be
reconnected with the new IP address.
Note: Confirm the updated settings have been updated by navigating back to the settings screen.
Note: The Modbus RTU setting are not User programmable.
LVD-EOMU02U-EN REVB 04/2022

Advertisement

loading