Operation; Before Starting; After Starting - Acromet ACRO-SMART AS.1 Manual

Diaphragm
Table of Contents

Advertisement

5.

OPERATION

5.1

Before Starting

5.1.1
Ensure the pump will be operated within its specification.
5.1.2
Check gearbox oil level. Prior to leaving factory, each pump is filled
to the correct level with the recommended grade of oil (see
maintenance section).
5.1.3
Check direction of rotation. Correct direction is anti-clockwise when
viewing pump from top of motor.
5.1.4
Ensure system control of isolating valves in discharge line are open.
5.2

After Starting

5.2.1
Pump will normally prime automatically.
necessary to run the pump at maximum capacity to clear air. If this
is unsuccessful install a return line from discharge pipe to supply tank
with valve to facilitate priming at reduced pressure and/or air release.
CAUTION:
5.2.2
Check that pump is operating correctly against discharge pressure.
5.2.3
Ensure that any problems are noted and appropriate corrective or
preventative action is taken.
Acro-Smart Electronic Series
If pumped liquid is hazardous do not disconnect
discharge pipe work.
January 2017
However, it may be
Acro-Smart Electronic Series

Advertisement

Table of Contents
loading

Table of Contents