Battery; Special Instruction For Use; Getting Started - gefran G-Vision 66-070 Operating Instructions Manual

Table of Contents

Advertisement

These devices are equipped with rechargeable Lithium
battery, not user-replaceable.
The following information is maintained by the battery:
• hardware real-time clock (date and time)
Figure 7.1: G-Vision 66-070, G-Vision 66-101, G-Vision 66-156, G-Vision 66-215
ATTENTION
Dispose of batteries according to local
regulations.

8. SPECIAL INSTRUCTION FOR USE

- The equipment shall only be used in an area of not more
than pollution degree 2, as defined in IEC/EN 60664-1.
- The equipment shall be installed in an enclosure that
provides a degree of protection not less than IP 54 in
accordance with IEC/EN 60079-15.
- Transient protection shall be provided that is set at a level
not exceeding 140 % of the peak rated voltage value at the
supply terminals to the equipment.
- Install the HMI device according to the accompanying
installation instructions.
- Ground the HMI device according to the accompanying
installation instructions.
G-Vision devices products delivery configuration is based on a
loader. Use the services of the loader to install applications on
the device such as GF Designer HD or GF Project VX runtime.
GF Designer HD or GF Project VX are required, they are
Gefran IDE software tools that must be properly installed on
a computer running Microsoft Windows.
If you are planning to use your G-Vision with Gf Project VX
you must first initialize it using the "System Settings menu"
(see next chapter).
16

7. BATTERY

9. GETTING STARTED

Charge:
At first installation must be charged for 48 hours.
When the battery is fully charged, it ensures a period of 3
months of data back-up at 25°C.
ATTENTION
This device cannot be disposed of as
a domestic waste but according to
WEEE European Directive 2012/19/EU
- Only qualified personnel may install the HMI device or
repair it.
- Ensure that the aeration holes are not covered.
- Care shall be taken not to allow layers of dust to form on the
graphic panel in a way that might cause the accumulation of
static charges. Keep the faceplate of the HMI device clean:
the equipment must be cleaned only with a soft cloth and
neutral soap product. Do not use solvents.
- This device should not be used for purposes and
methods other than indicated in this document and in the
documentation accompanying the product.
In "Application" menu select "App Management" and then
"install/update".
At this point you need the files "ata0a.zip" and "ata0a.zip.
md5sum" contained in the GF project VX installation folder
(C:\Gefran Automation Builder\GF_ProjectVX-4.x.x-64bit\
diskimages\install_zip\G-Vision\).
If you are accessing to system settings through a browser in
your PC simply point at the files in the indicated folder.
If you are operating directly on the panel touch screen insert
a USB key were you previously copied the files.
After proceeding with the installation procedure the panel
Battery
81085_G-Vision 66_12-2021_ENG

Advertisement

Table of Contents
loading

This manual is also suitable for:

G-vision 66-101G-vision 66-156G-vision 66-215

Table of Contents