Summary of Contents for Enelion LUMINA LB-32-3-MGR-00 Series
Page 1
Installation guide enelion.com/en/help MODEL LB-32-3-X-0-X-XX-MGR-00 MODEL LB-32-3-X-0-X-XX-GR-00 LUMINA 3in1 modular structure — build and upgrade your dreamed solution using the same base module. Quick installation — get your EV charger ready to work online in no more than 15 minutes of the...
Page 2
Dear Partner Congratulations on your purchase of the Enelion charger and thank you for your trust. Before installing the device, please ensure that the box contains all of the components. Up-to-date manuals for users and installers always available at: enelion.com/en/help Please read this manual before installation or prior to the station being commisioned.
Introduction ENELION LUMINA product family Tools necessary for installation Features Technical specifications Safety Safety instructions Before the installation Planning the installation Installation Installation instructions Daily use and operation How do I charge? Interface LED Maintenance and cleaning Practical details Customer service...
Features RFID LED SIGNALING SOCKET TYPE 2 WI-FI ROOM FOR OPTIONAL BACKUP POWER SUPPLY ROOM FOR OPTIONAL CERTIFIED ENERGY METER ROOM FOR OPTIONAL 230V CEE 7/3 SOCKET...
Flammability class Lumina Socket - Type2 Socket, Lumina Cable - Type2 connector with 4,7 m cord Charging connector type Embedded residual current monitor - Enelion RCMB 6 mA DC Residual current protection Integrated 3-phase energy meter >99 % accuracy Energy metering...
Page 8
3 x 400 V AC/ 230 V AC ( ±10 % ) (TN/IT) Supply voltage Possibility of connecting the cable from the top, bottom and the back of the station • configuration with no additional tools • remotely controlled schuko outlet* Other features •...
Safety instructions Safety instructions for use • Never use or touch the device if it is damaged or not functioning properly. • Always perform the recommended maintenance, installation and any repair Please read this manual before attempting to work by an authorised service centre and in install or commission the charger.
All local, regional and national electrical installation regulations must be observed.It is recommended to consider future charging Load Charging power needs before installation. • The power supply to the Enelion charging Ampere 1 phase 3 phase terminal must be provided from an electrical (kW) (kW) switchgear.
Page 11
WiFi network coverage at the station installation site and/or LTE mobile network coverage if the station is to be used online. enelion.com/en/help In addition to the steps described on the following pages, we recommend watching the installation videos.
Page 12
Installation of Electrical mounting plate connection For maximum charging power, it is recommended Turn off the power before installation. to use cables with a conductor cross-section Connect the electrical cable. not exceeding 6 mm . This is also the maximum Hang the mounting plate according to the diameter that can be installed in the connection template.
Page 13
CAUTION! It is recommended to use the existing colour code used in the wiring. Depending on the standard in your country, the cable colours may differ from those shown. CAUTION! Before switching on the power, make sure that the cables are connected correctly. Test this by pulling on each wire.
Page 14
Step by step Template leveling Drilling holes Screwing the backplane to the wall — marking holes — inserting pins — tightening the cable gland Stripping the Connecting insulation the wires from the cable...
Page 15
Enelion Lumina with optional 230V CEE 7/3 SOCKET and optional CERTIFIED ENERGY METER MODEL LB-32-3-X-0-X-XX-MRG-00...
Page 16
Enelion Lumina with optional 230V CEE 7/3 SOCKET MODEL LB-32-3-X-0-X-XX-RG-00...
Page 17
Slide Mounting the Mounting the Head cover with four SIM card installation screws Slide Two long and two short screws from the bottom Apply from the front Installation of Tightening the head Installing the an alternative two bolts from above reflector head...
Page 18
Access to the configuration panel is protected by Start-up a password, which by default is: admin. and configuration The password should be changed if necessary. of the station Switching on the safety devices, which turns on the voltage at the station, should be carried out by a suitably qualified person.
How do Daily use I charge? and operation Before using the Lumina charger, ensure that the following requirements are met: • An authorised electrician has made the electrical connection correctly. • The charger is correctly configured. • The software is up to date. •...
Interface LED Maintenance The Lumina charging station has an LED The device is designed to operate in interface that provides the user with basic temperatures from -30°C to 55°C. The manufacturer does not guarantee the correct information: operation of the charging station at temperatures outside of the specified range.
Standards Practical Enelion Sp. z o.o. hereby declares that this details product, the Lumina EV charging station, complies with: 2014/53/UE (RED) 2011/65/UE (RoHS) 2014/30/UE (EMC) 2014/35/UE (LVD) The full text of the EU Declaration of Conformity is available at: enelion.com...
Page 24
The manual may change as the product develops. The information provided may not be correct. All rights reserved. Revision: V 2 Number of pages: 24 Released: May 10, 2022 ENELION sp. z o.o. | 50 Pana Tadeusza St 80–123 | Gdańsk | Poland sales@enelion.com enelion.com...
Need help?
Do you have a question about the LUMINA LB-32-3-MGR-00 Series and is the answer not in the manual?
Questions and answers