Advertisement

Quick Links

Wallbox
Adspace
Assembly manual
Enelion Sp. z o.o.
info@enelion.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Wallbox Adspace and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Enelion Wallbox Adspace

  • Page 1 Wallbox Adspace Assembly manual Enelion Sp. z o.o. info@enelion.com...
  • Page 2 Copyright, Enelion Sp. z o. o. The manual may change as the product develops. The information provided may not be correct. All rights reserved. Revision: V 3.4 Number of pages: 21 Released: August 3, 2021...
  • Page 3: Table Of Contents

    7.1 Enelion Wallbox Adspace ........
  • Page 4 Before the installation, make sure that the module packages contain all the elements. Current version of the operation manual can be accessed at http://enelion.com/en/help/. See the contents of the manual before initiating any activities related to the installation or the activation of the charger.
  • Page 5: Important Information

    Wallbox Adspace - Assembly manual 8 - 2021 1. Important information 1.1. General Provisions It is forbidden to use any extensions of the charging ca- ble. Installation and servicing of the device must be per- The manufacturer is not responsible for loss of health formed by qualified and authorized persons, and re-...
  • Page 6: General Information

    The 3 mm Allen key – included with the charger accessories as Enelion Bridge, Enelion MID or Enelion – is needed to open (or close) the Enelion Wall- RCM B protection. Some parameters and functions can box Adspace. No other tool is necessary for this be changed by reprogramming the device with the use operation.
  • Page 7 Wallbox Adspace - Assembly manual 8 - 2021 6. Holding the front panel in the same plane, slide it downwards from the top groove of the device. Fig. 3: Inserting an Allen key. 3. Turn the key counterclockwise until the locking pin is aligned with the side of the charger.
  • Page 8: Design Indications Of The Installation

    2. installation of a type A residual current device (RCD A 30 mA/40 A) in the switchboard with the 3.2. Recommended communication net- application of Enelion RCM B – type B Residual work Current Monitor, attached to the charging termi- nal.
  • Page 9: Location Selection Criteria

    Wallbox Adspace - Assembly manual 8 - 2021 Enelion devices equipped with the Enelion Bridge mod- 3. 100 cm clearance below the bottom edge of the ule can use the Internet connection via the Ethernet in- device. terface in the LAN network. In order to utilize this func-...
  • Page 10: Assembly

    The opening diameter for the communi- Fig. 11: Mounting holes of Enelion Wallbox Adspace as cation cable gland is 19 mm. seen from the back of the device.
  • Page 11: Mounting The Device

    (both in the version with a gland in the upper and lower part of the device) Fig. 12: Locations of cable entry points in Enelion Wall- and the optimal cable lengths. Mounting holes box Adspace.
  • Page 12: Connection

    Power connection ply cables may be connected to the terminals or directly to the approved integrated MID meter. Enelion Wallbox Adspace comes in various types. De- pending on which type is being installed, the power sup- Variant 1 Variant 2...
  • Page 13: Standard Power Connection

    INFO For both charging sockets to function in Ene- 3. Insert the power supply cables into the terminals. lion Wallbox Adspace the voltage must be sup- plied to the electrical connection clamps of both charge controllers. The steps described below should be applied to the terminals of both charg- ing sockets.
  • Page 14: Power Connection In Version With Mid Meter

    5.1.3. RCM B Connection wires of the cable with sleeve terminals. Enelion RCM B – Residual Current Monitor type B ac- 3. Insert the power cables into the terminals of the cessory. Enelion RCM B in combination with the RCD MID meter and tighten them.
  • Page 15: Connection Of Communication Wires

    If the communication between the devices is expected bles (All three phases and neutral cord.) to be via Enelion Chain network, the cables should be connected to the charge controller. Two cores of the communication cable and the screen grounding are used for communication.
  • Page 16 Fig. 26: Termination diagram. Fig. 27: A sample jumper. Fig. 24: Diagram of Enelion Chain communica- tion cables connection (variant A) Fig. 25: Diagram of Enelion Chain communica- Fig. 28: The place of applying the terminating...
  • Page 17: Internet Connections Via Ethernet Interface In Lan Network

    It activates with the ap- pearance of voltage in the charging controller terminals. To provide the Internet connection to a charger equipped with Enelion Bridge module via Ethernet in- terface: 1. Insert the Ethernet cable into the device through the gland for communication cables.
  • Page 18: Maintenance

    Wallbox Adspace - Assembly manual 8 - 2021 6. Maintenance The device is designed to operate in temperatures from −25 °C to 55 °C. The manufacturer does not guarantee the proper functioning of the charging station in temper- atures outside the specified range. Chargers that are damaged because of exposure to temperatures below −25 °C or above 55 °C are not covered under the war-...
  • Page 19: Technical Data

    Wallbox Adspace - Assembly manual 8 - 2021 7. Technical data 7.1. Enelion Wallbox Adspace Electrical data Routing of the power cord Surface mounted Recommended minimum cross-section Power cord cross-section • 2 cords 5 x 6,0 mm (32 A nominal current)
  • Page 20 Wallbox Adspace - Assembly manual 8 - 2021 Ambient conditions Working temperature from −25 °C do 55 °C Storage temperature range from −40 °C do 80 °C Permitted relative air humidity from 5% do 95% Elevation above the sea level...
  • Page 22 © 2021 ENELION Pana Tadeusza 50, 80-123 Gda ´ nsk, Polska...

Table of Contents