MANUAL NO. 197440 KAG 2/27/13 REV A-9/1/17 ECN 17-141 PRO-TEC SAFEGUARD LIVESTOCK SHADE SHELTER- 16' X 24' IMPORTANT - TO THE DEALER OR ERECTOR: RETURN THIS MANUAL TO THE OWNER FOR THEIR FUTURE REFERENCE SIOUX STEEL COMPANY, P.O. BOX 1265, SIOUX FALLS, SOUTH DAKOTA 57101...
Page 2
DURABILITY, VERSATILITY, and COMMITMENT to meet the needs of our customer. Should you have any questions or comments during or following the installation, please feel free to call your SIOUX STEEL PRO-TEC dealer or manufacturer. We will be glad to assist you in any way we can.
Page 3
TABLE OF CONTENTS SAFETY PAGE 3 GENERAL INFORMATION PAGE 4 COMPONENTS PAGE 5-6 TOOLS & EQUIPMENT PAGE 7 FOUNDATION PAGE 8 FRAME ASSEMBLY PAGE 9-12 SHADE INSTALLATION PAGE 13-14 MAINTENANCE SCHEDULE PAGE 15 WARRANTY STATEMENTS PAGE 16...
Page 4
If damage to shade occurs, access in or around shade should be restricted to inspection only. Immediately contact your dealer or Sioux Steel Warranty Department at (800) 557-4689. Repair of damages should be implemented as soon as practical, with appropriate PRO-TEC replacement parts.
Page 7
TOOLS AND EQUIPMENT (CUSTOMER SUPPLIED) Drilling Tools: 3/8” Power Drill (for drill screws) 3/16” drill bit (for pilot drilling drill screws) Measuring Tools: Tape Measure 4' level Hand Tools: Drift Pin (for aiding hole alignment) Socket & Wrench Sizes 3/8” & ¾” Impact Wrench (pneumatic or electric) Excavating Tools: Spade Type Shovel Equipment to dig foundation...
Page 8
FOUNDATION CONCRETE FOUNDATION RECOMMENDATIONS - SHELTER SHOULD BE INSTALLED IN COMPACTED SOIL WITH A BEARING CAPACITY OF 3000PSF. - POST REQUIRES A 2' DIAMETER DRILLED PIER X 5' DEEP. - FOUR 1/2" DIAMETER HEADED STUD ANCHORS MUST BE EMBEDDED 8" WITH 2"...
Page 9
STEP 1 BILL OF MATERIAL S185797 (2)- FRAME WLDT S166164 (6)- SCREW- 1/2-13 HHC X 5 1/2" S154069 (12)- WASHER- 1/2" FLAT S189515 (6)- NUT- 1/2-13 NYLOCK * NOTE PLACES THAT DO NOT HAVE SCREW INSTALLED (1) S166164 (2) S154069 (1) S189515 1.1 PLACE FRAME WELDMENTS (2) ON FLAT LEVEL SURFACE WITH DRILLED HOLES IN THE CENTER.
Page 10
STEP 2 BILL OF MATERIAL (1) S185800A- COLUMN WLDT- 10FT OR S199082- COLUMN WLDT- 15FT (2) S185801- CHANNEL- BRACE (2) S166164- SCREW- 1/2-13 HHC X 5 1/2" (1) S166164 (4) S154035- SCREW- 1/2-13 HHC X 1 1/2" (1) S189515 (6) S189515- NUT- 1/2-13 NYLOCK (1) S185800A OR S199082 (1) S185801 (1) S154035...
Page 11
STEP 3 BILL OF MATERIAL (2) S185798- ANGLE- BRACE (2) S154035- 1/2-13 HHC X 1 1/2" (2) S189515- NUT- 1/2-13 NYLOCK (16) S181886- SCREW- 1/4" X 1 1/4" DRILL (4) S181886 (1) S185798 (1) S154035 (1) S189515 BASE (4) S181886 3.1 ATTACH ANGLE BRACE (2) TO CENTER COLUMN AND FRAME ASSEMBLY.
Page 12
STEP 4 4.1 CAREFULLY TIP THE FRAME ASSEMBLY AS SHOWN IN PHOTO. 4.2 ALIGN END OF COLUMN WITH PIER FOUNDATION ANCHORS. STEP 5 5.1 USING A CRANE OR OTHER SIMILAR DEVICE, CAREFULLY LIFT FRAME ASSEMBLY INTO PLACE ALIGNING BOLT PATTERN OF THE COLUMN BASE PLATE WITH PIER FOUNDATION ANCHORS.
Page 13
STEP 6 (1) S197159 BILL OF MATERIAL (2) S190007- TUBE- 2" X 16' SWAGED (2) S197159- TUBE- 2" DIA X 96" (4) S181886- SCREW- 1/4" X 1 1/4" DRILL (1) S190007 (2) S181886 STEP 6.1 ASSEMBLE 2" TUBES AS SHOWN ABOVE AND SECURE SWAGE CONNECTION WITH 1/4"...
Page 14
STEP 8 STEP 8.1 USING A MAN LIFT OR LADDERS, PLACE ROLLED UP PANEL ON TOP OF FRAME ASSEMBLY. STEP 8.2 USING (5) S192144 AT NOTCH POCKET LOCATIONS, WRAP STRAP AROUND TUBE & FRAME, FEED THRU RATCHET, AND SLIGHTLY TIGHTEN. STEP 8.3 UNROLL PANEL OVER TOP OF FRAME.
AS NECESSARY - PUNCTURES IN THE PANEL CAUSED BY ACCIDENTAL DAMAGE SHOULD BE REPAIRED IMMEDIATELY. CONTACT YOUR LOCAL SIOUX STEEL PRO-TEC DEALER OR MANUFACTURER FOR SERVICE INSTALLATION ADJUSTMENT - THE PANEL ON YOUR LIVESTOCK SHADE MAY RELAX AFTER INSTALLATION. IT IS CRITICAL TO KEEP THE PANEL TAUT (SNUG) OVER THE FRAME TO PREVENT WEAR AND ENSURE LONG LIFE.
Page 16
Year 6 = 15% Exclusions specific to Pro-Tec Buildings: Damage or loss of any kind from (1) exposure of the fabric cover or end panel material to any heat source for any length of time; (2) a failure to properly compact and engineer soils; (3) a failure to properly construct footings and foundations; and (4) exposure to conditions in excess of the design wind and snow load specifications.