Mass: 56.0 kg These instructions are for your safety. Please read through them thoroughly before use. PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE...
Let’s get started... Important information... Safety Preparation of base Warranty Care, maintenance & Recycling In more detail... Parts List Fascia & Nail List Detailed Technical Drawing 08-09 Hardware Chart Before you start Assembly Instructions 12-27 For a copy of the instructions or a copy in another language please send an email or write to the address below.
Safety Check that you have noted all the following instructions: We advise the use of non slip protective gloves throughout the assembly process. We advise the use of steel capped protective footwear throughout the assembly process. We advise that you use a helper to hold the glass in position whilst you nail the beading in place.
Base and Warranty Preparation of base... We recommend that the base onto which your building will stand should be at least 75mm larger in each direction than the total floor size of the building. Actual floor area of the building: 1848mm x 1848mm ...
Care, Maintenance and Recycling The 5 golden rules of care: Ensure your base is level and firm. Ensure the building is not sitting directly on the ground using damp proof membrane or the optional timber base. Ensure every piece of timber and surface, especially that is hidden upon assembly, is treated with a top quality wood preservative at least twice (before assembly).
Nail bag contents Description (part No ) - Qty Hardware Chart Scale 1:1 8mm Felt Nail (A0266) x 44 40mm Round Head Nail (A0025) x 54 25mm Posi-Drive Screw (A0032) x 51 40 40mm Posi-Drive Screw (A0033) x 12 60mm Posi-Drive Screw (A0035) x 26...
Before you start... Things to check before you start: Ensure your base is ready – See page 4. Check all parts as listed in the parts lists. Read the instructions fully before starting work. Follow all the health and safety guidelines. When you see the drill icon Only ever drill through the first piece of framework which will be a...
Assembly instructions: These instructions are for your safety. Please read through them thoroughly before use. Treat all the parts before assembly – see page 5! The “Panel layout” is showing you how to position the panels. GB-IE The Front and Back Panels FIT INSIDE THE SIDE PANELS! A5807 A5807 3’...
Page 13
Screw another 3’ Plain Panel (A5807) to the panel drilled in Step 1 as below. GB-IE Fix together using 2x 60mm Screws (A0035) using pilot holes drilled previously. Step 1 (A5807)x01 If using a drill or electric screwdriver carefully but firmly push the opposite end to the screwdriver bit 3’...
Page 14
GB-IE Drill the third 3’ Plain Panel (A5807) as below. Fix the panel using 2x 60mm Screws (A0035) using the pilot holes drilled in Step 1. 5 mm 3’ Plain Panel (A5807)x01 60mm Screws (A0035)x02 NOTE Some holes drilled for later use...
Page 15
Screw the last 3’ Plain Panel (A5807) as below using the pilot holes drilled in Step 3. GB-IE Fix using 2x 60mm Screws (A0035). 3’ Plain Panel (A5807)x01 60mm Screws (A0035)x02...
Page 16
GB-IE Place two 890 Frame (A5818) bars next to each other as below. Drill and screw one 890x25 Frame (A5819) centrally over the two 890 frame bars. Fix with 6x 40mm Screws (A0033). 890 Frame (A5818)x04 A5819 A5818 X2 890x25 Frame (A5819)x02 A5818 40 ...
Page 17
Drill and screw the Frame built in Step 6 in between the wall panels as below. GB-IE *Make sure the 25mm bar is facing inwards* Fix with 6x 60mm Screws (A0035). Step 6 60mm Screws (A0035)x06...
Page 18
Drill the 6’ RH Gable Panels (A5809) with two holes along the bottom and one in the middle. GB-IE Drill the 6’ LH Gable Panels (A5809) with two holes along the bottom. *One holes needs to be drilled at an angle as drill will not fit between panel* Fix with 10x 60mm Screws (A0035).
Page 19
Place the four OSB Roof Panels (A5810) onto your building so that it sits with an even GB-IE overhang around the sides. Nail 4x 40mm Nails (A0025) 29mm in from the edge, along the front and back edges and 3x 40mm Nails (A0025) 60mm in from the edge, along the sides. MAKE SURE THE NAILS GO INTO THE WALL AND GABLE FRAMEWORK.
Page 20
Nail the two 1188x46x12 Coverstrips (A5820) to the back of the building using 3x 40mm GB-IE Nails (A0025) in each. Nail one 1395x46x12 Coverstrip (A5821) to the back, centrally using 4x 40mm Nails (A0025). Nail the two 1188x80x12 Coverstrips (A5823) using 3x 40mm Nails (A0025) in each to the front of your building.
Page 21
1 strip of Felt (A3035) has been supplied. GB-IE Place the felt on top of your building as below, making sure there is an even overhang all around. Nail using 6x 8mm Felt Nails (A0266) along each front and back edge. Fold the felt under the roof panel along the sides and nail with 10x 8mm Felt Nails (A0266).
Page 22
Lay Doors (A5808) flat. GB-IE Screw the Tee Hinges (A0049) as below. Making sure they are screwed over the framework on the back of the door. Fix with 4x 25mm Screws (A0032) in each hinge. Hinge over door framework Door (A5808)x02 Back View Tee Hinge...
Page 23
GB-IE Using 1x 25mm Screw (A0032) in each hinge first, hang the doors within the framework. Tip: Use packing underneath the doors to level them out. Once happy, finish by screwing the rest of the screws into the hinges. Step 12 (A5808)x02 25mm Screws (A0032)x12...
Page 24
GB-IE Use the last 1395x46x12 Coverstrip (A5821). Get a measuring tape, saw and pencil, mark and cut the coverstrip into 2x 555mm pieces and 1x 205mm piece. 1395x46x12 Coverstrip (A5821)x01 Using the pieces cut in Step 14, screw the two 555mm pieces to the right hand door (or door GB-IE that you wish to open first), so that one that is flush with the bottom and one is flush with the top.
Page 25
Using 25mm Screws (A0032), fix the Hasp and Staple (A0123) to the Doors as below. GB-IE Make sure the Hasp is screwed to the door that opens first and that the Staple is screwed to the other. Tip: Mark where you want them to sit and where they meet before you screw. Hasp Staple Hasp and Staple...
Page 26
Position the bolt as below, mark where the bolt meets the framework and drill a hole for the GB-IE bolt to go into. Using 4x 25mm Screws (A0032), fix the Barrel Bolts (A0014) to the 80mm Coverstrips from Step 17. Repeat for the top. Barrel Bolt (A0014)x02 25mm Screws...
Page 27
Fix the 1021 Coverstrip (A5824) to the front and back of your building. Fix with 3x 40mm GB-IE Nails (A0025) in each. Lastly, fix the two Diamonds (A0019) to the coverstrips, centrally using 2x 40mm Nails (A0025) in each. 1021 Coverstrip (A5824)x04 Diamond (A0019)x02...