Pilot Run And Debugging Test; Daily Setting - Gree GMV-VDR5PH/SA-S Owner's Manual

Commercial air conditioners
Table of Contents

Advertisement

ERV+DX coil
(7) According to the electric wiring diagram in this manual, check if the power cord
complies with related requirements, if the wiring way is correct, if the joint is
secured, if the power voltage is normal.

4.2 Pilot Run and Debugging Test

Running test:
(1) Turn on the unit for running test after connecting power. Please pay attention
that if there is abnormal noise in the pipeline during actual operation and if the
unit has abnormal vibration or abnormal noise.
(2) Make sure if the unit installation floor, hanging rod and box iron, etc. can
withstand unit's weight during normal operation. Spring shock absorber can be
installed in the hanging rod if necessary, in order to prevent shock transmitting to
the floor.
(3) If there is abnormal situation, please cut off power immediately and refer to the
troubleshooting.
NOTE!
Please refer to the above-mentioned drainage test chapter to conduct drainage
test preferentially.

4.3 Daily Setting

(1) Pollution level setting and filter replacement reminder.
1) During equipment operation process, the unit will calculate the accumulative
operation time automatically according to the set outdoor pollution level and
remind the user to replace the consumable items. However, the ambient
condition of actual usage is complex, to enable the user to obtain correct
replacement and cleaning reminder, the user shall conduct setting for the
outdoor pollution level under actual usage condition.
2) Under startup or shutdown status, enter "Project setting" from the "Setting"
interface of wired controller menu directly, inquire "Outdoor pollution level
setting" in project setting to conduct setting for outdoor pollution level of the
unit.