Installation; Hardware Installation - LevelOne FCS-1050 User Manual

Day/night ip network camera
Hide thumbs Also See for FCS-1050:
Table of Contents

Advertisement

Installation

Hardware installation

Upon powering up, the device runs through a self-test procedure and the front LEDs
will blink between green and red a few times. If self-test passes, the LED will be green
and the Network Camera will standby for getting IP address. After getting IP Address,
the LED will blink green every second. If self-test fails the red LED will blink several
times. Refer to Appendix A for troubleshooting.
The Network Camera provides a general I/O terminal block with one digital input and
one relay switch for device control. Pin 1 and pin 2 can be connected to an external
sensor device and the state of voltage will be monitored from the initial state 'LOW'.
The relay switch of pin 3 and pin 4 can be used to turn on or off the external device.
Consult with the dealer of the peripherals for correct installation.
Please verify that your product package contains all the
accessories listed in the foregoing Package Contents.
Depending on the user's application, an Ethernet cable
may be needed. The Ethernet cable should meet the specs
of UTP Category 5 and not exceed 100 meters in length.
Connect the power adapter jack to the Network
Camera before plugging in to the power socket. This will
reduce the risk of accidental electric shock.
1
DI-
INPUT (Initial state of DI is low)
2
DI+
INPUT (Max. 50mA, 12VDC)
3
SW_COMMON
OUTPUT (open from SW_OPEN at initial state)
(close with SW_OPEN when set DO to ON)
4
SW_NOPEN
OUTPUT (Max. 1A, 24VDC or 0.5A, 125VAC
- 5 -

Advertisement

Table of Contents
loading

Table of Contents