• The solar module may be mounted by using the
following methods: (*Torque:8~12N∙m)
• When installing modules in heavy snow areas,
it is recommended to be taken an appropriate
countermeasure to prevent possible damages to the
lower side frame by slipping snow.
• We recommend to use corrosion resistant material
for these supporting part. (A snow guard should be
installed in accordance with the manufacturer's inst
ructions.)
Roof
Mounting by using frame bolts holes
• Secure the solar module to the structure by using the
factory mounting holes.
• Four M8 stainless steel bolts, four nuts, four spring
washers, and eight flat washers are recommended
per solar module.
• The module may be fastened to a support by using
both the outer and inner bolt holes of the frame.
• Each module should be securely fastened at a
minimum 4 points on two opposite sides.
and location of mounting holes is provided in 'Product
• Tighten the bolt securely by using the combination.
Place the spring washer between the Flat washer a
nd Nut.
* Mounting Rails Material : Aluminum, Stainless steel, etc.
→ We recommend more than 40x40mm mounting rails.
Solar module
Supporting part
Module frame
Nut
Spring washer
Flat washer
Mounting Rail
Flat washer
Bolt
Mounting by using clamps
• The module may be fastened to a support by using
clamps on both the long edge and the short edge of
the modules.
provided in 'Mechanical Installation Scene'. (Refer to
Appendix.)
→ If you use a special clamp, it needs to test for
compatibility by LGE.
• If the installation is likely to be affected by heavy(extre
me) snow, further suitable panel support is recommen
ded on the lower row of panels.