2.13

Minimum clearance from walls

With a horizontal flue gas connection, make sure the electronic
components inside the boiler at the top remain accessible when placing
an elbow directly on the flue outlet adapter.
▶ After fitting the flue bend, check whether the top cover of the
appliance is easy to remove ( § 7.2, p. 18).
▶ There must be a clearance of at least 100 mm directly above the bend
at the boiler.
2
3
1
S
5,2 %
(52 mm/1 m)
Fig. 4
Side view [mm]
[1]
Horizontal flue outlet
[2]
Collar
[3]
Vertical flue outlet
A
Clearance from top of boiler - hard borehole Clearance
B
from top of boiler - upper side of borehole
Depth of boiler: 365 mm
Diameter of borehole
C
Wall thickness
K
S
Wall thickness S K [mm] for Ø flue outlet [mm]
Ø 110/160
15 - 24 cm
190
24 - 33 cm
195
33 - 42 cm
200
42 - 50 cm
205
Table 3 Diameter of borehole K
Condens 7000 WP – 6721841195 (2022/01)
136
C
0010040879-001
Ø 110
140
145
150
155
Flue gas routing
Ø 110 mm
Connection adapter with elbow,
horizontal flue outlet.
Ø 110/
160 mm
Ø 110 mm
Connection adapter, vertical
flue outlet
Ø 110/
160 mm
Table 4 Clearance A and B depending on flue outlet
Determine the minimum clearance above the boiler.
▶ Add dimension B from Table 4 to the height of the top of the boiler.
▶ With a horizontal flue outlet:
– Add 52 mm to dimension B for every meter of horizontal flue
outlet.
– In this case also take the diameter of the collar into consideration.
▶ With a vertical flue outlet:
– Maintain a clearance of at least 100 mm above the boiler to allow
the electronic components to be accessed and worked on.
Minimum space required for the boiler.
▶ Provide an unobstructed space of at least 100 cm for the
boiler to allow maintenance and other work to be carried out.
Distance from walls at sides.
▶ Maintain a clearance of at least 5 mm on the weather side of the
boiler.
≥ 5*
Fig. 5
Front view [mm]
2.14

Flue gas temperature sensor

The boiler is manufactured with a flue outlet sensor as standard (
Fig. 1, p. 6).
The flue gas temperature sensor protects the boiler and flue system
from high flue gas temperatures by setting back the boiler load
(downward modulation).
Product Information
A [mm] B [mm]
165
A + 0.5*K
179
A + 0.5*K
-
0
-
0
≥ 5*
260
300
520
0010033512-001
9