Page 1
INSTALLATION MANUAL Touch BOILIN G CHILLED SPARKLING HOT & COLD 220V/50Hz...
Page 2
CONTENTS QUATREAU TOUCH INSTALLATION MANUAL TYPICAL INSTALLATION • QUATREAU TOUCH TYPICAL INSTALLATION • QUATREAU PRE-INSTALLATION CHECKLIST • UNPACKING YOUR EQUIPMENT • INSTALLING QUATREAU TAP 3, 4 • CONNECTING YOUR TAP 5, 6 • INSTALLING THE QT553 • INSTALLING THE CS20 •...
Page 3
2. Cold Water Supply: 1/4” (6.35mm) lever ball 5. Power: The system requires two dedicated CARB IN REQUIRED FOR A SUCCESSFUL IN- valve. 220V/13 amp circuits to run your Quatreau. CHILLED IN STALLATION. IF YOU DO NOT HAVE THIS PLEASE REQUEST IT FROM YOUR MAINS...
Page 4
QT553 unit when it SmartTap™ other ends to the manifold outlet stems pro- is installed. truding from the top of the QT553 as follows: * If installing SmartTap™ model, please use the template to cut hole TouchTap™ INSTALLING QUATREAU TAP CONNECTING YOUR TAP...
Page 5
As part of this installation, you will also install a The Quatreau chiller carbonator is sited next to separate cold water supply with a 1/2” (12.7mm) the QT553. Usually, this will be to the left of the isolation valve.
Page 6
5. Refit the housing to the system and activate RE-SANITATION AND FILTER the water supply. CHANGE PROCEDURE Sanitation only needs to be done when they change the Carbon Filter. To sterilize the water heater and chiller system and change filter at service intervals, use the following procedure.
Need help?
Do you have a question about the Touch 553-B and is the answer not in the manual?
Questions and answers