Page 3
4. Power: The system requires two (2) dedicat- b. Drill and bits suited to the work surface ed 220V/13 amp circuits to run your Quatreau. c. SmartTap™ 1 x 30mm core bit (or closest match) d. SmartTap™ with Drain 1x 150mm core bit (or closest match) * 30mm core bit for the buttons.
Page 4
2. Place the saddle valve in a position to allow proper gravity fall from the faucet through the air gap into the saddle valve. INSTALLING QUATREAU SMART TAP™ INSTALLING AIRGAP DRAIN...
Page 5
SECTION FOUR SECTION FIVE INSTALLING THE VENTILATION CONNECTING WATER SUPPLY FOR THE CHILLER UNIT 1. Connect your cold water supply using the 1/4” (6.35mm) blue tubing that is supplied in the kit. Ventilation will ensure your chiller performs to Connect it to the right side of the boiler. its specifications.
Page 6
You may need to add a pump to ensure tilation and air movement, without which the the optimum psi is supplied to the Quatreau system will not chill correctly. system. DO NOT TURN ON THE POWER TO THE 8.
Page 7
5. Refit the housing to the system and activate RE-SANITATION AND FILTER the water supply. CHANGE PROCEDURE Sanitation is required at an annual service, where the carbon filter is also changed. To ster- ilize the water heater and chiller system and change filter at service intervals, use the follow- ing procedure.