Milwaukee M12 SPL Operator's Manual

Milwaukee M12 SPL Operator's Manual

360 single plane laser

Advertisement

Quick Links

OPERATOR'S MANUAL
Cat. No.
M12 SPL
M12™ GREEN 360° SINGLE PLANE LASER
WARNING
To reduce the risk of injury, user must read and understand operator's manual.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the M12 SPL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Milwaukee M12 SPL

  • Page 1 OPERATOR'S MANUAL Cat. No. M12 SPL M12™ GREEN 360° SINGLE PLANE LASER WARNING To reduce the risk of injury, user must read and understand operator's manual.
  • Page 2: General Power Tool Safety Warnings

    Maintain labels and nameplates. These carry • important information. If unreadable or missing, with another battery pack. contact MILWAUKEE for a replacement. ® • The device conforms to the most stringent battery packs. Use of any other battery packs may requirements of the relevant Electromagnetic Compatibility (EMC) Standards and Regulations.
  • Page 3: Specifications

    FUNCTIONAL DESCRIPTION SPECIFICATIONS Cat. No............ M12 SPL Volts............12V DC Battery Type ..........M12™ Charger Type..........M12™ Laser............Class 2 Max Power........... P Frequency............10 KHz Pulse Duration Normal Mode ....T Pulse Duration Power Save....T Wavelength.......... 510-530 nm Beam Divergence ........... 3 rad Working Range ..........
  • Page 4: Operation

    If stored in excessive heat or cold, allow at least 2 hours to acclimate to ambient temperature before turning on the tool. OPERATION If problem persists, please contact a MILWAUKEE ® service facility for support. To reduce the risk of injury or tem...
  • Page 5: Maintenance

    Horizontal Height Accuracy 6. Rotate the full tool with bracket 180° without changing the height, allow it to self-level, and mark A free measuring distance of approximately 20 m on the centre of horizontal line on wall A (point III). a firm surface between two walls or structures A and Point III should be aligned as vertically above or B is required for this check.
  • Page 8 Australia and New Zealand. SERVICE - AUSTRALIA and NEW ZEALAND MILWAUKEE ® prides itself in producing a premium quality product that is Nothing But Heavy Duty Your satisfaction with our products is very important to us! If you encounter any problems with the operation of this tool, please contact your authorised MILWAUKEE ®...

Table of Contents