Installation Checklist; Packing List - Kalamazoo AFPO-C-2-NA-NG Use And Care Manual

Artisan fire pizza oven
Table of Contents

Advertisement

Installation Checklist

Installer should initial next to each item:
F
Specified clearances maintained
F
Initial assembly completed — all tape and internal packaging removed
F
Heat diffusers installed
F
Crumb tray installed
F
Control knobs installed
F
Ceiling stone installed
F
Cooking deck installed
F
Igniters click when button is pressed — visible sparks from upper and lower igniter probes
F
Upper and lower burners light within 4 to 5 seconds following lighting procedure.
F
Manual shutoff valve is installed and accessible
F
Homeowner informed of shutoff valve location
F
Unit and supply connections have been tested and are free of leaks
F
Leave this Use and Care Guide with the homeowner
HOMEOWNER: Please ensure the installer completes the checklist, explaining each
item to you. The installer should initial each item above and sign below.
Installer Signature
80
Date
KalamazooGourmet.com

Packing List

Please ensure you have all of these parts before discarding any packaging.
A.
Base Unit
B.
Cooking Deck
C.
Mid-Body
D.
Ceiling Stone
E.
Roof
F.
Lower Control Knob
G.
Upper Control Knob
H.
Crumb Tray
I.
Door
J.
Bulk Gas Hose (for NG or
bulk supply LP units)
K.
LP hose and regulator (for
units using 20# (9kg) LP tank
I
F
H
+1.800.868.1699
E
D
C
B
A
K
G
J
81

Advertisement

Table of Contents
loading

This manual is also suitable for:

Afpo-c-2-na-lpcylAfpo-c-2-na-lpblk

Table of Contents