Installation Checklist
Installer should initial next to each item:
F
Specified clearances maintained
F
Initial assembly completed — all tape and internal packaging removed
F
Crumb tray installed
F
Control knobs installed
F
Ceiling stone installed
F
Cooking deck installed
F
Igniters click when button is pressed — visible sparks from upper and lower igniter probes
F
Lower burner control valve low setting adjusted to minimum stable flame height
F
Upper and lower burners light within 4 to 5 seconds following lighting procedure.
F
Manual shutoff valve is installed and accessible
F
Homeowner informed of shutoff valve location
F
Unit and supply connections have been tested and are free of leaks
F
Leave this Use and Care Guide with the homeowner
HOMEOWNER: Please ensure the installer completes the checklist,
explaining each item to you. The installer should initial each item above
and sign below.
Installer Signature
54
Date
KalamazooGourmet.com