Panasonic ET-DFD95 Installation Instructions Manual page 11

Dual stacking mount bracket (for dlp based projectors)
Table of Contents

Advertisement

Assembly process
3. Attach the gas springs to the left and right frames.
Plate bolts(M5x10)
Left frame
This bracket attaches to the upper frame.
4. Attach the upper frame to the upper projector.
(continued)
Base frame
Gas spring
[1] Attach the lower end of the gas spring unit to the left
frame using the plate bolt (M5x10) as shown on the
left.
Fix the other gas spring to the right frame in the
same manner.
Spring upper end for attachment
to the upper frame
Mark
Gas spring
Note:
The upper end of the gas spring is indicated with a
mark. Confirm this mark when attaching.
[1] Remove the four adjustment legs (when use the
projector is PT-D9510U, PT-D9510E, PT-D9610U,
or PT-D9610E, remove the handle) from the upper
DLP
TM
Projector (See page 10.)
[2] Insert adjustment bolt (M10) and washer (A) in the
adjustment leg holes as shown below .
Washer (A)
Indented side of washer
Snap pin hole
Adjustment bolt (M10)
Spring upper end for attachment
to the upper frame
Extendible portion
11

Advertisement

Table of Contents
loading

Table of Contents