Download Print this page

Toro Trans Pro 100 Installation Instructions page 3

18in rail conversion kit

Advertisement

11.
Loosely mount each locking bracket to the ramp
with flange-head screws (5/16-18 x 3/4 inch)
and flange nuts
(Figure 1
1. Load ramps
2. Locking bracket
12.
Raise and lock the ramp. Adjust the locking
brackets so that they are engaged on the pins,
and tighten the flange screws and nuts
and
Figure
3).
13.
Mount the new, longer wheel rods to the front
and rear sets of mounting holes in each side of
trailer, using brackets and fasteners previously
removed
(Figure 1
and
Figure
3).
Figure 3
3. Ramp
and
Figure
2).
g217627
(Figure 1
3

Advertisement

loading

This manual is also suitable for:

110-7345