ABB VD4 Installation And Service Instructions Manual page 4

Table of Contents

Advertisement

V D 4 - INSTALLATION AND SERVICE INSTRUCTIONS
4
2. Checking on receipt
On receipt, check the state of the apparatus,
integrity of the packing and correspondence with
the nameplate data (see fig. 1) with what is
specified in the order confirmation and in
the accompanying shipping note.
Also make sure that all the materials described in
the shipping note are included in the supply.
Should any damage or irregularity be noted in the
supply on unpacking, notify ABB (directly or through
the agent or supplier) as soon as possible and in any
case within five days of receipt.
The apparatus is only supplied with the accessories
specified at the time of ordering and validated in
the order confirmation sent by ABB.
The accompanying documents inserted in the
shipping packing are:
• instruction manual (this document)
• test certification
• identification label
• copy of the shipping documents
• electric wiring diagram.
Other documents which are sent prior to shipment
of the apparatus are:
• order confirmation
• original shipping advice note
• any drawings or documents referring to special
configurations/conditions.
Before carrying out any operation, always
make sure that the operating mechanism
spring is discharged and that the
apparatus is in the open position.
A
Circuit breaker
VD4 ... ... ...
1
CLASSIFICATION ... ... ...
3
SN ... ... ...
M MASS
Ur
Ur
4
ELECTRIC DIAGRAM
... ... ... ...
FIG. ... ...
.. ... ... ...
OPERATING MECHANISM
B
5
- MBO1 ... ... ... V
Made by ABB
Caption
A
Circuit breaker rating plate
B
Operating mechanism rating plate
1
Type of apparatus
2
Symbols of compliance with Standards
3
Serial number
4
Circuit breaker characteristics
5
Characteristics of the operating mechanism auxiliaries
Fig. 1
IEC 62271-100
2
CEI 17-1
PR. YEAR ......
...
kV

Advertisement

Table of Contents
loading

Table of Contents