Inspection Recommendations

Before Completing the Installation

Follow these steps before completing installation:
STEP 1. Replace and secure the dead-front access panels.
STEP 2. Close and lock the door of the PCS enclosure(s).
STEP 3. Wipe down the exterior of the PCS enclosure(s)
with a clean damp cloth. Refinish any scratches or
abrasions.
STEP 4. When application of touch-up paint is necessary,
the area to be touched up should be cleaned to
remove all oil and grease. Sand the area, removing
any traces of rust that may be present, and make
sure all edges are feathered before applying primer.

Pre-Startup Checklist

The pre-startup checklist will be provided and should be
reviewed and filled out by the installing contractor. The
document must be signed and faxed to S&C Electric Company
at (414) 423-8766.

Annual Inspections

After the PureWave SMS-250 system is commissioned and
the unit is online, inspection and maintenance should be
scheduled for the PCS on an annual basis to ensure the
proper operation of the system. Schedules for maintenance
should be reviewed by the customer based upon the given site
conditions and, if required, the frequency of the recommended
maintenance should increase to ensure the reliability of the
PureWave SMS-250 system.
16
S&C Instruction Sheet 659-555

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PureWave SMS-250 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents