Preventative Maintenance Schedule - Becker Picchio 2200 Maintenance Manual

Table of Contents

Advertisement

Preventative Maintenance Schedule:

Every 40-200 Hours:
o If installed Check and clean air intake filter
o Max of 4 blast air filter cleanings
Grease Bearings Every 2000 Hours:
o Grease bearings while unit is running.
Vane Inspection and Dust Separator – Every 3,000 Hours:
o Check vanes for minimum height.
o Replace dust separation element
Maintenance:
A new filter should be installed if clogged
A new filter should be installed annually
Replace if at or close to min vane height value.
Check for improper wear or chipping of vanes.
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents