Download Print this page

Tools And Materials Required; Preparing For Installation; Kit Contents - HP UPS R6000 Installation Instructions Manual

Extended runtime module
Hide thumbs Also See for UPS R6000:

Advertisement

Checking the Battery
Recharge Date
Before unpacking the ERM, check the battery recharge date
specified on the battery recharge date label that is affixed to the
shipping carton.
IMPORTANT: Do not use the battery if the recharge date has passed. If the
date on the battery recharge date label has passed without the battery being
recharged, contact an HP authorized service representative for directions.
NOTE: The following label is only an example date. The date on your carton
may be different.

Kit Contents

Documentation
• Important Safety Information guide
• International Regulatory Compliance guide
• This document
Rails
• Rails, with mounting hardware
• Rack template tool 3U (347218-022)
ERM
• ERM chassis
• Battery packs (2)
• Front bezel
Additional Hardware
The following items are supplied for shipping a rack with a UPS
installed:
• M6 nuts (4)
• M6 flat washers (4)
• M6 split washers (4)
Cables
• ERM power cable (attached to unit)

Tools and Materials Required

The following tools are required:
• #2 Phillips screwdriver
The following items are supplied with the rack:
• Screws
• Cage nuts
• Cage nut-fitting tool

Preparing for Installation

Powering Down the UPS
To power down the UPS:
1. Shut down all load devices.
2. Press the Standby button to take the UPS out of Operate mode.
Power to the load receptacles ceases.
3. Disconnect the UPS from utility power.
4. Wait at least 60 seconds while the UPS internal circuitry
discharges.
Unpacking the ERM
Transport the packaged ERM to its installation location. Unpack
the ERM near the rack where it will be assembled, following the
instructions on the carton. Verify that all components are present.
WARNING: The battery packs are charged from the factory. To
prevent personal injury from electric shock, do not touch the
metal contacts inside the connector.
Mounting the Rails
The ERM must be mounted on the fixed rails supplied with the
unit. Before beginning this installation process, review and adhere
to the following precautions.
WARNING: To prevent personal injury, verify that the rack
containing the ERM is stable. The following conditions must be
met:
The leveling feet are extended to the floor.
The full weight of the rack rests on the leveling feet.
The stabilizing feet are attached to the rack if it is a
single-rack installation.
The racks are coupled together if it is a multi-rack
installation.
Only one component should be extended at a time. A rack
may become unstable if more than one component is
extended for any reason.

Advertisement

loading