Sharp CD-BA3100H Service Manual page 22

Hide thumbs Also See for CD-BA3100H:
Table of Contents

Advertisement

CD-BA3100H
LIFT GEAR A
45
46
10
47
11
TRAY JOINT GEAR F
(CHANGE BOX L ASS'Y) ASSEMBLING POSITION
LIFT CAM
Assembling procedure
1. Turn the mode big gear approx. 37 degrees in the arrow direction.
2. Assemble the change box L ass'y.
Note: At this time, the tray joint gear F must be located in the position shown in figure.
Moreover, the gear must be engaged securely.
3. After assembly, return the mode big gear to the initial position.
4. Assemble the lift cam.
Note: At this time, the lift cam (No.40) must be located in the position shown in figure 22.
All manuals and user guides at all-guides.com
28
42
41
Figure 22
44
40
43
LIFT
CAM
Scale: 2 magnifications
40
LIFT CAM
– 22 –
Mark position
32
33
30
TRAY DRIVE GEAR F
02
CHANGE BOX L
< Importance >
Direct the recess part
(trapezoidal side) of the
axis 35 in this direction.
35
TRAY JOINT GEAR F
*2
30
TRAY DRIVE GEAR F
35
TRAY JOINT GEAR F
*1
*1: To position the axis part
of 35, engage it with 33.
*2: When it is aligned as
described in *1, the hatched part
(low gear-height part of gear)
will be positioned as shown.
Since this gear engagement is not
visually checked, verify that it does
not float when the gear box L is installed.
Scale: 2 magnifications
< Importance >
During assembly, make the
O part visible in this direction.
Note: Among 4 ribs on the
circumference, one rib alone
is provided with O.
30
TRAY DRIVE GEAR F
35
TRAY JOINT GEAR F

Advertisement

Table of Contents
loading

Table of Contents