AMX CB-TP17 Installation Manual
AMX CB-TP17 Installation Manual

AMX CB-TP17 Installation Manual

Rough-in box for 17" wall/flush mount touch panels

Advertisement

Overview

Wall Mount panels (NXDs) are contained within a metallic outer housing (back box).
This back box is not removed when installing the NXD into a Rough-In Box
(CB-TP17). The back box is only removed to gain access for the replacement of the
Compact Flash component or upgrade to the VESA housing.
The CB-TP17 Rough-In Box is an optional metallic box that is secured onto a beam in
a pre-wall setting (where no walls or present). Installation procedures and
configurations can vary.

Specifications

CB-TP17 (FG034-10) Specifications
Dimensions (HWD)
• 13.55" x 17.07" x 3.49"
• 34.43 cm x 43.38 cm x 8.85 cm
Included
Rough-In Box Installation Kit (SA2001-02)
Accessories
• 4 Phillips pan-head (#4-40 x 0.375 Black) screws (80-0115)
• 4 Phillips pan-head (#4-40 x 0.625 Black) screws (80-0118)
Certifications
• UL 508A
WARNING: INSTALLER, LEAVE A GAP BETWEEN THE STUD AND ROUGH-IN
BOX TO ACCOMMODATE THE DRYWALL/SHEETROCK.
This gap allows the installation of the drywall/sheetrock after the CB-TP17 has been
mounted onto the beams. The stud notching and Rough-In Box installation must be
done prior to any wall installation.
Note: The most important thing to remember when mounting this Rough-In Box is that
the mounting tabs must be mounted flush against the outside of the sheetrock. This
step determines whether or not the mounting stud is notched (cutout-out to fit the
Rough-In Box).

Pre-Wall Installation of the CP-TP17 Rough-In Box

1.
Remove the rough-in box cover (A in FIG. 1) before installation of the Rough-In
Box (B). Note: the cover MUST be removed before drywall installation. The
cover may be reinstalled after drywall installation using 4-40 screws (not
included)
.
A
FIG. 1
CP-TP17 Rough-In Box with cover
2.
Measure the distance between the inside of the two selected stud beams. Most
beams have a distance of about 14" to 16". This is too narrow to accommodate
the 17.072" (43.36 cm) wide CB-TP17 Rough-In Box.
3.
Determine whether one or both of the selected stud beams must be notched
(FIG. 3). The determining factor is the flush alignment of the mounting tabs along
the outside of the post-wall sheetrock.
4.
Cutout the notched beam using a height of 13.554" (34.43 cm) (as shown in
FIG. 3) and a depth equal to the thickness of the drywall.
Note: The determining factor in the depth of the cut into the beam is the thickness of
the drywall. The mounting tabs MUST BE FLUSH against the drywall and therefore,
the depth of the notch depends on that thickness.
5.
Insert one side of the Rough-In Box into the indention on the notched stud and
rest the other side of the box against the opposite beam.
6.
Install and secure a shorter horizontal beam below the Rough-In Box. This beam
acts to support the weight of the box from below and should be secured to both
vertical beams (at the sides).
7.
Fasten the CB-TP17 to the Notched stud/beam through the stud fastening
holes, located on the inside of the Rough-In Box (FIG. 4), by using either nails or
screws.
CB-TP17
6 locations to secure cover
after applying drywall
(8-32 x .25 screws)
B
4 locations to secure cover
after applying drywall
Rough-In Box for 17" Wall/Flush Mount Touch Panels
8.
Insert a perpendicular block between the Non-Notched stud/beam and the
Rough-In Box. This block acts as a bridge to secure the stud/beam to the
CB-TP17 along the stud fastening holes located inside of the box.
9.
Secure the perpendicular block to the Non-Notched stud/beam (FIG. 4) by
using either nails or screws.
10.
Fasten the CB-TP17 to the block through the stud fastening holes, located on
the inside of the Rough-In Box (FIG. 4), by using either nails or screws.
11.
Remove any necessary wiring knockouts from the (optional) Rough-In Box
(CB-TP17) (FIG. 4) where the necessary cables are threaded through for
connection to the touch panel.
12.
Thread the incoming RJ-45, Ethernet, and any other audio/video wiring through
the knockouts (use of the top or bottom knockouts are
recommended with this installation).
13.
Install the drywall/sheetrock before inserting the main NXD unit into the
CB-TP17.

Installing the 17" panel within a CB-TP17 Rough-In Box

The Rough-In Box must be mounted prior to continuing this section. Verify that all
necessary cables have been threaded through the knockouts on the Rough-In Box
and the connections have been tested prior to installation of the 17" panel.
1.
Remove the magnetic faceplate/bezel (A in FIG. 2) from the main NXD unit (B in
FIG. 2) by gripping the faceplate and pulling with gentle outward force.
2.
Verify the incoming RJ-45, Ethernet, and any other audio/video cables have
been properly threaded through the wiring knockouts on the left of the Rough-In
Box. Leave enough slack in the wiring to accommodate any re-positioning of the
panel.
3.
Connect all data and power wiring connectors to their corresponding locations
along the side of the (un-powered) NXD touch panel.
Verify the terminal end of the power cable is not connected to a power supply
before plugging in the 2-pin power connector.
The USB connectors can be from either a USB extension cable, or a wireless
USB RF transmitter.
Note: Don't disconnect the connectors from the touch panel. The unit must be
installed with the attached connectors before being inserted into the CB.
4.
Test the incoming wiring by connecting the panel connections to their terminal
locations and applying power. Verify the panel is receiving power and functioning
properly to prevent repetition of the installation.
5.
Disconnect the terminal end of the power cable from the connected PSN power
supply.
6.
Carefully slide the main NXD unit (B in FIG. 2) into the Rough-In Box, so the
Mounting Tab lies flush against the Rough-In Box (C in FIG. 2).
7.
Insert and secure four securing #8 flat-head Mounting Screws into their
corresponding holes located along the sides of the NXD. These #8 screws are
not included within the CB Installation Kit.
8.
Replace the magnet faceplate (A in FIG. 2) back onto the main NXD unit. Make
sure to align the Microphone, Light, and PIR Motion sensor locations to their
respective openings on the front bezel/faceplate.
9.
Connect the terminal RJ-45, Ethernet, and any optional audio/video wiring to
their respective locations (outside the Rough-In Box) on either the AVB breakout
box, Ethernet port, or NetLinx Master.
10.
Reconnect the terminal power connector on the PSN and apply power.
Do not use these
tabs to mount
Four #8 flat-head
the Rough-In Box
Mounting Screws
(not included)
secure the NXD to
CB-TP17
A - Faceplate
(bezel)
FIG. 2
Wall Mount panel installation configuration of a CB-TP17
Installation Guide
Support block
C - Optional
CB-TP17
Stud
Mounting Tab
B - Main NXD unit consists of
the touch panel and backbox housing

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CB-TP17 and is the answer not in the manual?

Questions and answers

Summary of Contents for AMX CB-TP17

  • Page 1 Rough-In Box (FIG. 4), by using either nails or screws. The CB-TP17 Rough-In Box is an optional metallic box that is secured onto a beam in Remove any necessary wiring knockouts from the (optional) Rough-In Box a pre-wall setting (where no walls or present).
  • Page 2 ©2011 AMX. All rights reserved. AMX and the AMX logo are registered trademarks of AMX. AMX reserves the right to alter specifications without notice at any time. 3000 RESEARCH DRIVE, RICHARDSON, TX 75082 • 800.222.0193 • fax 469.624.7153 • technical support 800.932.6993 • www.amx.com...

Table of Contents