Return Air Temperature; Return Air Relative Humidity - Bosch FHP RT-20 Installation, Operation And Maintenance Manual

Energy recovery ventilators
Table of Contents

Advertisement

14. At this time, verify that both compressors are
running and record intake and discharge water
temperatures. Record the results on the Start-Up
Checklist.
If only the lead compressor is running, force the
second compressor into operation by temporarily
installing jumpers on the terminal strip from R to
Y1 and R to Y2. Record intake and discharge
temperatures after five minutes of operation with
both compressors running.
15. Verify correct operation of optionally installed
accessories such as motorized dampers, electric
heaters, hot water coils, etc. It may not be
possible to test all options (e.g. electric preheater
may not function till ambient temperatures drop).
Make note on the Startup Checklist of any tests
that could not be completed.
Instruct owner on unit and thermostat / controller
operation.
WARNING
All motor(s) / compressor(s) have been checked for
rotation. If blower rotation is incorrect, wiring must
be changed at the disconnect to ensure all motor(s) /
compressors are corrected.
Operation of scroll compressor(s) in this unit are
directional and will be damaged if run with the wrong
direction.
• Allow the unit to run until the refrigerant system
stabilizes. Approximately 1-2 minutes.
• Take the following measurements while the unit is
running to ensure proper operation.
Start-Up Checklist
Check line voltage at unit disconnect
_______
L1-L2 volts
_______
L2-L3 volts
_______
L1-L3 volts
Fan RPM
_______
Supply Fan
Correct fan rotation direction
Supply Fan
Exhaust Fan
Motor Amp Draw
_______
_______
L2 amps
_______
L3 amps
_______
_______
L2 amps
_______
L3 amps
_______
Crankcase Heater
38
Model RT Energy Recovery Unit
______
Exhaust Fan
Yes / No
Yes / No
_______
_______
L2 amps
_______
L3 amps
_______
Crankcase Heater
Outdoor Air Temperature
_______
Deg F
_______
Outdoor Air Relative Humidity
_______
% RH
_______
_______
Should be between 8° and 12°F
_______
Should be between 12° and 17°F
_______
Should be between 300 and 500 PSIG
for R-410A
_______
Should be between 100 and 135 PSIG
for R-410A
_______
Suction Line Temperature
_______
Deg F
Hot Gas Bypass Operational
_______
Yes / No
Intake water temperature
_______
Deg F
Discharge water temperature after five (5) minutes
_______
Heat Mode
______
Cooling Mode

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fhp rt-45Fhp rt-55Fhp rt-90

Table of Contents