Page 1
Management-Handbuch Produktion How to pack a STX1000 Apply a piece of adhesive tape to keep the roll in shape Cut a piece of bubble wrap, fold it once and roll it. Lift the Handling lift assembly by hand and place the roll under it.
Page 2
Management-Handbuch Produktion Pack the Unit in protection foil. Screw the „Etafon“ on the palette and then put the unit on. Attention: There has to be 20mm space between the Incubator and the palette. Packing_STX1000.doc 2010.10.18 Page 2 of 3...
Page 3
Management-Handbuch Produktion The screwing: Screw each side wall together with the palette with two screw at the outer bottom corner at first at the middle. and then with one screw Next step, screw the sidewalls at the upper corners together, also with two screws. Place screws the whole edge with a distance of 350 mm.
Need help?
Do you have a question about the STX1000 and is the answer not in the manual?
Questions and answers