EEV Kit installation
A
Preparing for Installation
1
Check dimension and installation location.
2
Check installation place.
By using a pattern sheet, check required installation space.
105
120
190
333
323
313
202
100
Required
maintenance space
25
Maintenance hole must be located on
the ceiling.
82
Indoor unit pipe
connection
450
Hole in anchor
Hole in plug
Suspension bolt(3/8" or M10)-field supply
450mm X 200mm or more
(Maintenance Hole)
549
500
458
403
500
Required maintenance
360
space
Outdoor uint pipe
connection
Drain hole
Required maintenance
50
space
: http://splitoff.ru/tehn-doc.html
Concrete
Insert
Unit : mm
97
100
Required
maintenance space
25
9