Eev Kit Installation - Samsung AM Series Installation Manual

Hide thumbs Also See for AM Series:
Table of Contents

Advertisement

EEV Kit installation

A
Preparing for Installation
1
Check dimension and installation location.
2
Check installation place.
 By using a pattern sheet, check required installation space.
105
120
190
333
323
313
202
100
Required
maintenance space
25
 Maintenance hole must be located on
the ceiling.
82
Indoor unit pipe
connection
450
Hole in anchor
Hole in plug
Suspension bolt(3/8" or M10)-field supply
450mm X 200mm or more
(Maintenance Hole)
549
500
458
403
500
Required maintenance
360
space
Outdoor uint pipe
connection
Drain hole
Required maintenance
50
space
: http://splitoff.ru/tehn-doc.html
Concrete
Insert
Unit : mm
97
100
Required
maintenance space
25
9

Advertisement

Table of Contents
loading

Table of Contents