Plumbing After The Suction Side Header And Before The Pump - Paramount Fitness EDC Installation & Owner's Manual

Table of Contents

Advertisement

Available languages

Available languages

Install 3 Way Valve
Ahead of the LeafVac ONLY
Suction From the
Skimmer, Main Drain
or Spa
NOTICE
it is an EDC or a plumbing manifold.
The EDC canister is made of a 30% glass fi lled Noryl material for strength.
This requires priming the sockets
Fittings, unions and pipe are not included.
Apply primer twice before gluing
pipe or fittings to EDC canister
Always be sure to have a minimum of 8
inches of pipe between the suction inlet of
the pump and the fi rst connection whether
two
times, before applying the PVC glue.
8
8" Minimum
Straight Pipe
Pump

Advertisement

Table of Contents
loading

Table of Contents