Receiving
The shipment should be thoroughly inspected as
soon as it is received. The signed bill of lading is
acknowledgement by the carrier of receipt in good
condition of shipment covered by our invoice.
If any of the goods called for on this bill of lading
are shorted or damaged, do not accept them until
the carrier makes a notation on the freight bill of
the shorted or damaged goods. Do this for your
own protection.
Quality Lifts
NOTIFY
loss or damage is discovered after receipt
IT IS DIFFICULT TO COLLECT FOR LOSS OR
DAMAGE AFTER YOU HAVE GIVEN THE
CARRIER A CLEAR RECEIPT.
File your claim with
Support your claim with copies of the bill of lading,
freight bill, and photographs, if available.
Flooring
Be certain you have the proper concrete floor to
properly handle the loaded lift. Floor should be in
generally good condition with no large cracks,
spalling or deterioration. Minimum requirements for
concrete are 4 inches minimum depth, with steel
reinforcement per local commercial practice, 3500
psi, cured for 28 days. Floor should be level within
1/4 inch over the installation area. If these
conditions cannot be met, pads can be poured to
accommodate the lift. Pad must be minimum of 8
ft x 8 ft x 1 ft minimum thickness, 3500 psi steel
reinforced mechanically attached to existing floor.
Failure
provide the recommended
WARNING
mounting
result in unsatisfactory lift
performance,
damage, or personal injury.
Vertical Clearance
Check the height of the area where the lift is to be
installed. Clearance should be calculated based on
the full raised height of the lift plus the height of the
tallest vehicle you intend to service.
Failure
WARNING
provide adequate clearance
could result in unsatisfactory
lift
damage, or personal injury.
File: MR6-IOM-Q.doc
Model QMR6
Installation, Operation, and Maintenance
AT ONCE if any hidden
Quality Lifts
promptly.
by
purchaser
surface
could
property
by
purchaser
performance,
property
Electrical Requirements
For lift installation and operation, it is necessary to
have a dedicated 115V single-phase 60-cycle
circuit with a 20 amp circuit breaker or time delay
fuse.
Tools Required for Installation
1. Wrenches: 7/16, 1/2, 9/16, 5/8, 11/16, 15/16, 1
1/8 inch
2. Ratchet drive with the following sockets: 7/16,
1/2, 9/16, 1 1/8 inch
3. Funnel
4. Adjustable wrenches: 8 and 12 inch
to
to
4
Rev: 3/26/09