Congratulations, you have just purchased the finest watering fountain on the
market. This unit is built to give you excellent service when properly installed
and maintained. Please follow instructions carefully. Read and understand all
instructions before installing.
Ritchie Industries, Inc.
800-747-0222
Part # 17836
www.ritchiefount.com
5 March, 2022
@RitchieWaterers

Advertisement

loading

Summary of Contents for Ritchie Pork King Series

  • Page 1 Installation Instructions for Pork King Series Congratulations, you have just purchased the finest watering fountain on the market. This unit is built to give you excellent service when properly installed and maintained. Please follow instructions carefully. Read and understand all instructions before installing.
  • Page 2 16458 Pork King 2-1 - 120V 298W 2.5A@120V 16846 Pork King 2-1 - 240V 448W 1.9A@240V 16459 Pork King 4 - 120V 548W 2.5A@120V 16845 Pork King 4 - 240V 848W 3.5A@240V Pork King Series Instruction Manual 5 March, 2022...
  • Page 3 (not included) is recommended for concrete installations. Anchor bolts are available from Ritchie in a two pack, part # 14261. Use an all-weather sealant under the outside edge when anchoring to concrete to keep air from leaking under fountain.
  • Page 4 O. Install Cover – Once all water line connections have been checked for leaks and electrical hook-up is complete, drop the valve cover into the groove on the top of the unit. Pork King Series Instruction Manual 5 March, 2022...
  • Page 5 Ritchie Valves Ritchie valves come in various sizes and pressure ratings as shown below - green for high supply line pressure, red for moderate supply pressure, and white for low-pressure applications. Differences in the size of trough also impacts valve choice. Your individual situations may require a change from the standard valve supplied with your fountain, see your Ritchie Dealer if this is needed.
  • Page 6 POWER WARNING - CHECK NAMEPLATE FOR CORRECT VOLTAGE. ONLY CONNECT 230-240VAC TO 240V UNITS. 8/16/2021 WIRING DIAGRAM SHOWN WITH 2 Wiring-2021.dwg HEATERS - QUANTITY MAY VARY TDU - Sheet: 1 of 1 Pork King Series Instruction Manual 5 March, 2022...
  • Page 7 16664 200W Element (240 Volt) 4 Pkg. 15155 Screw – Hinge Rod (10/Pkg.) 1 Pkg. 16424 48W Cable Heater (240 Volt) 1 Pkg. NS = Not Shown Italicized text = Not included or optional configuration add-ons Pork King Series Instruction Manual 5 March, 2022...
  • Page 8 1 Pkg. For 240 Volt Pork King 2-1 Part #16846, See Parts Below 18628 Drain Plug (2/Pkg.) 1 Pkg. 16664 200W Element (240 Volt) 2 Pkg. 16326 Hinge Rod Only PK 2-1 16424 48W Cable Heater (240 Volt) 1 Pkg. Pork King Series Instruction Manual 5 March, 2022...
  • Page 9 16664 200W Element (240 Volt) 2 Pkg. 15155 Screw – Hinge Rod (10/Pkg.) 1 Pkg. 16424 48W Cable Heater (240 Volt) 1 Pkg. NS= Not Shown Italicized text = Not included or optional configuration add-ons Pork King Series Instruction Manual 5 March, 2022...
  • Page 10 16093 Hinge Rod Only – PK1 16424 48W Cable Heater (240 Volt) 1 Pkg. 15155 Screw – Hinge Rod (10/Pkg.) 1 Pkg. NS = Not Shown Italicized text = Not included or optional configuration add-ons Pork King Series Instruction Manual 5 March, 2022...
  • Page 11: Troubleshooting

    A severe pressure drop indicates a restriction or undersized supply system. Check that shutoff valves are fully open Pork King Series Instruction Manual 5 March, 2022...
  • Page 12: Component Parts

    Ritchie Limited Warranty E f f e c t i v e J u n e 2 0 2 1 Poly Units Ritchie Industries, Inc. warrants its products to be free of defective materials and workmanship. Defective Base, top and ball closures part(s) will be repaired or replaced at the option of 10 year limited against manufacturing defect.