Indoor Distribution (4.8 kv through 34.5 kv)
INTRODUCTION
Ç
CAUTION
The equipment covered by this publication must be
selected for a specific application and it must be
installed, operated, and maintained by qualified
persons who are thoroughly trained and who under-
stand any hazards that may be involved. This publi-
cation is written only for such qualified persons and
is not intended to be a substitute for adequate train-
ing and experience in safety procedures for this
type of equipment.
General
These instructions are for operation of S&C Alduti-Rupter
Switches—Indoor Distribution and S&C Alduti-Rupter ®
Switches with Power Fuses—Indoor Distribution. (For re-
fusing instructions, refer to the applicable instruction
sheet for the fuse type being used.) Alduti-Rupter
Switches are equipped for manual operation by means of
a chain-coupled handle, a direct-coupled handle, or a
pipe-coupled handle.
For instructions on operation of Alduti-Rupter
Switches power operated by means of an S&C Switch
Operator—Type AS-30, refer to S&C Instruction Sheet
854-501.
Security Provisions
Alduti-Rupter Switches are designed for installation in
metal-enclosed switchgear (or in vaults) with provision
for external operation. Since these enclosures are often in
areas accessible to the general public as well as autho-
rized but unqualified persons, care must be taken to alert
such persons to the presence of high voltage within the
enclosure by providing suitable signs, e.g., "Cau-
tion—High Voltage—Keep Out" and "Do not enter or oper-
ate this high-voltage equipment unless you are qualified."
It is the responsibility of the purchaser, the installer, and
the ultimate user to ensure that such signs are attached
and are not removed. Make sure that all access doors and
all switch operating handles are securely locked when the
gear is left unattended by qualified persons—even
momentarily.
Supersedes Instruction Sheet 783-501 dated 2-16-81
s
S&C ELECTRIC COMPANY
S&C ELECTRIC CANADA LTD.
Three-Pole
INSTRUCTIONS
For Operation
c
1983
Chicago
Toronto
Qualified Persons
Although only qualified persons may operate, inspect, or
maintain power switchgear, this should pose no problem
to users of S&C Alduti-Rupter Switches—the equipment
rarely needs attention and mechanical maintenance is
generally not required. The only "maintenance" recom-
mended is periodic cleaning and inspection—of insulators
in particular, plus occasional exercising. (It is not unusual
for "regular" operations of interrupter switches to take
place as infrequently as once every five years.) Fuse
replacement is very infrequent, since fuse operations
(blowings) occur on an average of once in 20 years.
In addition, qualified persons are available promptly
from an electrical contractor experienced in high voltage,
or (upon prior agreement) from the serving utility.
Construction and Performance
The S&C Alduti-Rupter Switch—Indoor Distribution is a
three-pole, group-operated interrupter switch; factory-
assembled on a rugged base of welded construction.
Included is an integral quick-make, quick-break mecha-
nism for swift, positive opening and closing, independent
of the speed of handle operation—thereby contributing to
Alduti-Rupter's ability to achieve fast circuit interruption
and two-time duty-cycle fault-closing ratings. d This abil-
ity permits quick restoration of service following a
fault—without the need for an extended outage for
replacement of switch parts, or for temporary restoration
of service through an alternate switch until replacement
parts can be obtained. It also permits use of Alduti-Rupter
in fault sectionalizing (lockout) schemes where switches
are closed and then opened sequentially until the fault is
isolated. The ability to open following a fault-closing oper-
ation is of especial importance where remote or auto-
matic control is utilized.
In marked contrast to Alduti-Rupters, with their duty-
cycle fault-closing ratings, are switches with simple "fault-
closing" or "make-and-latch" ratings which, following an
d Two-time duty-cycle fault-closing rating defines the ability to close the
switch twice against a three-phase fault with asymmetrical current in at
least one phase equal to the rated value, with the switch remaining opera-
ble and able to carry and interrupt rated current.
INSTRUCTION SHEET
783-501
Page 1 of 4
August 29, 1983

Advertisement

loading

Summary of Contents for S&C Alduti-Rupter

  • Page 1 Since these enclosures are often in parts can be obtained. It also permits use of Alduti-Rupter areas accessible to the general public as well as autho- in fault sectionalizing (lockout) schemes where switches rized but unqualified persons, care must be taken to alert...
  • Page 2 The Alduti-Rupter Switch interrupts the circuit without coupled handles. external arc or flame. No oil or vacuum is used. The arc is Chain-Coupled Handles are used for the majority of entirely contained and extinguished within the air-filled...
  • Page 3 • fied persons, observing the following precautions. Note Open and close manually operated interrupter switches that Alduti-Rupter Switches are capable of live-switching with a continuous, unhesitating movement of the oper- ating handle until a complete, latched condition of the duties in accordance with their ratings.
  • Page 4 These recommendations may differ from the user’s operating and safety procedures. Where a discrepancy exists, users should follow their procedures. TO RESTORE TO NORMAL OPERATION • So that the Alduti-Rupter Switch is ready for normal opera- Switchgear bay (or vault) access door is closed and padlocked (or interlocked).