S&C 2000 Series Instructions Manual
S&C 2000 Series Instructions Manual

S&C 2000 Series Instructions Manual

Circuit-switchers

Advertisement

S&C Series 2000 Circuit-Switchers
Outdoor Transmission (69 kV through 230 kV)

TABLE OF CONTENTS

Section
Qualified Persons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Read this Instruction Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Retain this Instruction Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Proper Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Understanding Safety-Alert Messages . . . . . . . . . . . . . . . . . . . 3
Following Safety Instructions . . . . . . . . . . . . . . . . . . . . . . . . . 3
Replacement Instructions and Labels . . . . . . . . . . . . . . . . . . . 3
Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Packing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
INTRODUCTION
The following instructions are for field replacement of
interrupters for S&C Series 2000 Circuit-Switchers rated
69 kV through 230 kV.
The Series 2000 Circuit-Switcher interrupter is a porce-
lain-enclosed, hermetically sealed device containing
sulfur-hexafluoride (SF
) gas under pressure. It employs
6
an operating rod which is driven to the open position at
high speed, by means of a power train connected to the
Series 2000 Circuit-Switcher Operator, to effect circuit
interruption. This operating rod is also driven to the
closed position at high speed to effect circuit closing
within the interrupter.
Supersedes Instruction Sheet 716-600 dated 9-13-93
S&C ELECTRIC COMPANY
Interrupter Replacement
INSTRUCTIONS
For Field Replacement
Page Number
c
2002
Section
REPLACEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
ON MODELS 2020, 2025, AND 2030 . . . . . . . . . . . . . . . . . . . . . . 5
ON MODELS 2010, 2015, and 2040 . . . . . . . . . . . . . . . . . . . . . . 12
Installing the Transmitter . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Programming the Receiver . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
INSPECTION SCHEDULE AND PROCEDURES . . . . . . . . . . . . 24
Qualified Persons
Ç
WARNING
The equipment covered by this publication must be
installed, operated, and maintained by qualified per-
sons who are knowledgeable in the installation, oper-
ation, and maintenance of electric power distribution
equipment along with the associated hazards. A quali-
fied person is one who is trained and competent in:
The skills and techniques necessary to distinguish
exposed live parts from non-live parts of electrical
equipment.
The skills and techniques necessary to determine
the proper approach distances corresponding to
the voltages to which the qualified person will be
exposed.
The proper use of the special precautionary tech-
niques, personal protective equipment, insulating
and shielding materials, and insulated tools for
working on or near exposed energized parts of
electrical equipment.
These instructions are intended only for such qual-
ified persons. They are not intended to be a substitute
for adequate training and experience in safety proce-
dures for this type of equipment.
INSTRUCTION SHEET
Page Number
716-600
Page 1 of 24
February 11, 2002

Advertisement

Table of Contents
loading

Summary of Contents for S&C 2000 Series

  • Page 1: Table Of Contents

    S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INSTRUCTIONS For Field Replacement TABLE OF CONTENTS Section Page Number Section Page Number INTRODUCTION BEFORE STARTING INTERRUPTER REPLACEMENT ........4 Qualified Persons .
  • Page 2: Read This Instruction Sheet

    S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INTRODUCTION —Continued Read this Instruction Sheet Proper Application Read this instruction sheet thoroughly and carefully Ç CAUTION before installing or operating your S&C Series 2000 Cir- cuit-Switcher. Familiarize yourself with “SAFETY INFOR- The replacement interrupter(s) and associated equip- ment in this publication is (are) only intended for use MATION”...
  • Page 3: Safety Information

    SAFETY INFORMATION Understanding Safety-Alert Messages Following Safety Instructions There are several types of safety-alert messages which If you do not understand any portion of this instruction may appear throughout this instruction sheet as well as sheet and need assistance, contact your nearest S&C on labels attached to the Series 2000 Circuit-Switcher.
  • Page 4: Inspection And Packing

    S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INSPECTION AND PACKING Inspection Packing Examine the shipment for external evidence of damage as The Series 2000 Circuit-Switcher interrupter is a porce- soon after receipt as possible, preferably before removal lain-enclosed, hermetically sealed device containing from the carrier’s conveyance.
  • Page 5: Interrupter Replacement On Models 2020, 2025, And 2030

    INTERRUPTER REPLACEMENT ON MODELS 2020, 2025, AND 2030 nished with a loosely attached ³⁄₈ —16 2 carriage bolt Step 1 After following the user’s standard procedures for clearing at each end. Position this container-half so that the car- riage-bolt threads protrude through the holes at the and tagging equipment on which work is to be performed, ends of the other container-half as shown in Figure 1.
  • Page 6 S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INTERRUPTER REPLACEMENT ON MODELS 2020, 2025, AND 2030 — Continued (d) Using a screwdriver as necessary to spread the edges, (h) Pull the cable taut at the coupling end of the inter- snap the two halves together as shown in Figure 3.
  • Page 7 INTERRUPTER REPLACEMENT ON MODELS 2020, 2025, AND 2030 — Continued Step 4 Interrupter Remove the four ⁵⁄₁₆ —18 ³⁄₄ hex-head stainless-steel lifting bracket cap screws used to attach the access cover to the side of the transition box on the insulating support column. See Figure 4.
  • Page 8 S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INTERRUPTER REPLACEMENT ON MODELS 2020, 2025, AND 2030 — Continued Step 8 Open the replacement interrupter shipping crate. Attach Spacer (marked with a two suitable lifting slings to the replacement interrupter black/yellow striped label) (the center of gravity is at approximately the center of the unit).
  • Page 9 INTERRUPTER REPLACEMENT ON MODELS 2020, 2025, AND 2030 — Continued Step 9 NOTICE Attach a lifting sling to the lifting bracket on the The operating rod is under pressure; when the two replacement interrupter. Then carefully lift the interrupter screws are removed, the holding bracket may move somewhat higher than the top of the transition box on the about ¹⁄₂...
  • Page 10 S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INTERRUPTER REPLACEMENT ON MODELS 2020, 2025, AND 2030 — Continued Step 11 For interrupters with the remote gas-density monitor Interrupter lifting option, see “Installing the Transmitter” on page 18. bracket Attach the replacement interrupter to the insulating support column as follows.
  • Page 11 INTERRUPTER REPLACEMENT ON MODELS 2020, 2025, AND 2030 — Continued (e) Now remove and discard the ⁵⁄₁₆ —18 2¹⁄₄ hex-head remove the remaining ³⁄₈ —16 ⁷⁄₈ cap screw—it’s stainless-steel screw, stop bracket (marked with a needed to temporarily retain the other container-half. black/yellow striped label), and spacer (marked with a (d) Pry the container-halves apart with a screwdriver.
  • Page 12: Interrupter Replacement On Models 2010, 2015, And 2040

    S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INTERRUPTER REPLACEMENT ON MODELS 2010, 2015, AND 2040 Step 17 (a) Remove the two container-halves from the shipping After following the user’s standard procedures for crate. Note that one of the container-halves is fur- nished with a loosely attached ³⁄₈...
  • Page 13 INTERRUPTER REPLACEMENT ON MODELS 2010, 2015, AND 2040 — Continued shields for the interrupter pressure-relief device and low- nished. (These items are included with the replace- gas-pressure indicator, furnished with the replacement ment interrupter, in a separate box.) Hand-tighten the interrupter (in a separate box), using two ¹⁄₂...
  • Page 14 S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INTERRUPTER REPLACEMENT ON MODELS 2010, 2015, AND 2040 — Continued Step 23 Ç CAUTION With a moderate strain on the lifting slings, carefully slide the interrupter away from the transition box and lower it Do not remove the replacement interrupter bolted-on to the ground.
  • Page 15 INTERRUPTER REPLACEMENT ON MODELS 2010, 2015, AND 2040 — Continued Step 27 the connecting pin and pin retaining clip used to attach Thoroughly wire-brush the indicator end casting of the the holding bracket to the coupling. Retain the connecting replacement interrupter where the terminal pad is to be pin and pin retaining clip for re-use in Step 30, but discard attached, as well as the mating surface on the terminal the holding bracket.
  • Page 16 S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INTERRUPTER REPLACEMENT ON MODELS 2010, 2015, AND 2040 — Continued Step 30 For Circuit-Switchers rated 161 kV and 230 kV: For interrupters with the remote gas-density monitor Insert the connecting pin retained from Step 28 into the option, see “Installing the Transmitter”...
  • Page 17 INTERRUPTER REPLACEMENT ON MODELS 2010, 2015, AND 2040 — Continued Step 31 tainer-half to the coupling end casting of the inter- rupter, and the ³⁄₈ —16 ⁷⁄₈ hex-head cap screw and Replace the access cover retained from Step 20 and securely tighten the associated ⁵⁄₁₆...
  • Page 18: Interrupters With The Remote Gas-Density Monitor Option

    S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INTERRUPTERS WITH THE REMOTE GAS-DENSITY MONITOR OPTION Installing the Transmitter When replacing an interrupter on Series 2000 Circuit- Switchers with the remote gas-density monitor option, the Sensor cable transmitter must also be replaced.
  • Page 19 INTERRUPTERS WITH THE REMOTE GAS-DENSITY MONITOR OPTION — Continued On Circuit-Switchers with horizontal interrupters (Model 2010, Model 2015, and Model 2040), the transmit- ter is mounted on an adapter panel. The adapter panel is Operating Sensor cable mounted in place of the transition box access cover. Remove the six stainless-steel ⁵⁄₁₆...
  • Page 20 S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INTERRUPTERS WITH THE REMOTE GAS-DENSITY MONITOR OPTION — Continued Step 41 Grounding strap Ground the transmitter to the transition box with the sup- plied grounding strap. Clamp one end of the grounding strap to the bottom of the transmitter housing, and the other to the transition box.
  • Page 21 INTERRUPTERS WITH THE REMOTE GAS-DENSITY MONITOR OPTION — Continued Step 44 Using the mounting hardware saved from Step 38, reat- tach the transmitter to the transition box, making sure that the black antenna cover faces the ground. See Figure 19. Repeat Steps 37 through 44 for each interrupter to be replaced.
  • Page 22: Programming The Receiver

    S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INTERRUPTERS WITH THE REMOTE GAS-DENSITY MONITOR OPTION — Continued Programming the Receiver After replacing an interrupter and transmitter, the remote Set-up button gas-density monitoring system must be reprogrammed. Programming “teaches”...
  • Page 23 INTERRUPTERS WITH THE REMOTE GAS-DENSITY MONITOR OPTION — Continued Step 47 Press—and hold for 5 seconds—the sytem set-up button. S&C RGDM A-Phase Set The A-phase set-up prompt will be displayed. See Figure Up. Use Magnet To Start A-Phase Remote. Step 48 Press Button To Go To initialize A-Phase, press and release the set-up button again.
  • Page 24: Inspection Schedule And Procedures

    S&C Series 2000 Circuit-Switchers Interrupter Replacement Outdoor Transmission (69 kV through 230 kV) INTERRUPTERS WITH THE REMOTE GAS-DENSITY MONITOR OPTION — Continued Step 49 After all three phases are initialized, the LCD will show Check Serial Numbers the three interrupter serial numbers in the order the SS-0608-001 phases were initialized.

Table of Contents